787 mm toilet paper machine
Negotiable /Set
Min.Order:1 Set
Qinyang City Huaxia Paper Making Machinery Co., Ltd.
Company Profile
Huaxia Paper Making machine factory Co., Ltd is a high tech enterprise specialized in designing and manufacturing paper -making equipment, pulping equipment and paper finish equipment.
Established in 1982, Huaxia started manufacturing paper-making equipment in early period in China with strong technology, reasonable designs and scientific quality management systems. Over the past 20 years, our enterprise develops rapidly and our production capacity and production level become higher. We are rewarded as honest enterprise by the government.
Our leading paper machinery : 600 model, 1092 model, 1760 model, 1880 model, 2400 model, 2880 model, 3200 model, 3600 model and egg tray making machine. We provide accessories and aux equipment and also we can manufacture according to customers’ requirement.
With our superior products, good service and honesty, we are looking forward to having bright business with customers.
Tel: +86 391 5659000
Mobil: +86 15225883100
skpye:wangxiaopuwell
Wechat:1003813045
QQ:879530931
Alibaba website:qyhxmachine.en.china.cn
Technical parameters
Net width: 787mm
Working speed: 20-80 m/min
Gram weight standard: 15-180g
Output: 1.5-2.5 ton
Cylinder: Φ700×1100mm
Dryer: Φ1000×1100mm polishing
Land rail distance: 1300mm
Kind of drive: gear drive
Weight: 5.2 ton
Matching motor: adjustable speed motor4KW
Reduction machine: JZQ-250 model
Overall dimension: (LWH): 5500×1600×1700 mm
Remark:
The equipment includes all of the land rails, electrical machines, electrical equipments, back wheels, cardan joint couplings, pulleys, belts, screws, sizing blocks, dowels, bearings, base rings, carpets and wires.
We will send 2 engineers to be responsible for installation commissioning and training workers. You need to pay them $75 per day for each person and provide them food, hotel, air tickets and transportation. The installation period will be 60 days.
The delivery time will be 45 days after deposit in advance.
We will send 2 engineers to be responsible for installation commissioning and training workers. You need to pay them $75 per day for each person and provide them food, hotel, air tickets and transportation. The installation period will be 60 days.
The delivery time will be 45 days after deposit in advance.