equipment for welding of polyethylene pipes manual plastic fixed welding equipment
USD $5.65 - $36.76 /Set
Min.Order:50 Sets
Zhejiang Xinniu Pipe Co., Ltd.
ppr pipe hydraulic heat fusion welding machine ppr pipe heat butt fusion welding machine
pex-al-pex pipe extrusion line aluminum and plastic composited pipe machine
Germany quality standard all types of hot water ppr pipe fittings male prass union
High Quality Customize Male Thread Adaptor fittings for Cold/Hot Water Supply Pipe System
1. ppr pipe welding machine Specification:
1. Electoronic temperature control, Aluminum alloy pipe moulds+thickening,welding range:20-63mm(iron handle)
2. Heat Element: heating element with thermostat(electoronic temperature control)
3. Temperature rang:0-300degree
4. Voltage rang:220/110v
5. Power:800w 50/60HZ
6. Size: 20-63mm
7. Welding materail:ppr pe pp-c
2. ppr pipe welding machine Major Technical Standards
1.using conditions:below 1000 meters(sea level)
environment temperature:-20 degree-----50 degree
ralative humidity:45%----95%
2,heater temperature:about 260 degree.
3,safety standard:insulating resistance above 1m
3. ppr pipe welding machine Operation process:
1) fixed fusion splicer heating end, the fusion splicer placed on shelves, according to the required heating pipe installation specifications corresponding die head, use the wrench tight, generally small head in the front .
2) power supply has a red and green light on the machien, on behalf of heating a red light, green light on behalf of constant temperature, for the green light for the first time do not use, must be the second time when the green light before use, hot melt temperature at 260 °C to 280 °C. Below or above this temperature, can cause joint cannot be completely fusion, water leakage later days.
3)or each tubing ends before construction, should check whether the damage on the pipe to prevent transit damage, if there is damage or not sure, the port should be minus 4-5 cm, does not use a hammer or weight to tap the pipe to prevent pipe explosion, relative to improve service life.
4) cutting pipes must make end surface is perpendicular to the axis of the tube, pipe cutting should be used for pipe cutting.
5)when heated, without rotating the pipe to inserted into the depth of the mark, at the same time, with no rotation to push the pipe fitting into heating mode, reaches mark.
6)after achieve heating time, take the pipe and the fitting down from the mould at the same time, rapidly without rotating linear homogeneous has inserted into the melt depth, to form a uniform flange joint, and to control the rebound after inserted.
20 pipe hot 14 mm depth, the heating time for 5 seconds, the processing time for 4 seconds, cooldown 3 minutes.
25 pipe hot 15 mm depth, heating time 7 seconds, the processing time for 4 seconds, cooldown for 3 minutes.
32 pipe hot depth of 16.5 mm, 8 seconds, heating time and processing time for 4 seconds, cooldown 4 minutes.
40 pipe hot 18 mm depth, heating time of 12 seconds, the processing time for 6 seconds, cooldown 4.5 minutes.
50 pipe hot depth 20 mm, the heating time, 18 seconds processing time for 6 seconds, and cooldown for 5 minutes.
63 pipe hot 24 mm depth, heating time and 24 seconds.7 seconds and processing times cooldown 6 minutes.
7)n the above-mentioned provisions of the processing time, just good welding joint can be corrected, but a small amount of rotation, but the processing time, it is strictly prohibited to correction. Note: good pipes and pipe fittings with no tilt phenomenon, to do basic horizontal even vertical, to avoid the installation bibcock, Angle is not right, not install properly.
8) within the prescribed cooling time, forbidden to have just processed under joint force
ppr welding machines:
4.OUR FACTORY:
5.CERTIFICATES
6.Why choose us?
(1) Professional factory: We are manufacturer, specializing in manufacturing multilayer PP-R, PE pipe and PP-R, PE pipe fittings for more than 20 years, our price is competitive with high quality. And we can delivery product in quick way.
(2) Sample: We can send samples out in 3 days, but the express charge usually paid by your side, but the fee will be rebound when we have formal order.
(3) Rapid response to your needs:We will be answer within 24 hours. Welcome to contact with us if you have any problems. We are looking to cooperating with you.
(4) We hope we can establish long-term and mutual benefit business relation with you.If you have any problem, please kindly feel free to contact me. I will try the best to help you!
ntact method
skype:fish201321