china emergency eye wash station
Negotiable /Set
Min.Order:100 Sets
Yifeng Clean Technology Jiang Su Shares Co., Ltd.
China emergency eye wash station
You should check the type of products, instruction and the packing list for another time.The location of the emergency equipment should be installed within 10 seconds walking time or 15 meters from the hazard.Installation and maintenance.
The connection of the bracket and the pipe:
connect the T-piece of outlet with the bracket.
The installation of the bracket:
Adjust the position of the T-piece and install it by M10 screw.
The installation of shower pipe:
screw on the sprayer head (G3/4” net gasket inside) to sprayer pipe, enwind the other end of sprayer pipe with Teflon tape, tighten at the up part of erect pipe, and then adjust the position of sprayer head and to lock well the
Product details:
1. Body: 304 Stainless steel
2. Eye Wash: 304 stainless steel inlet pipe, S/S stay-open ball valve with flag handle & S/S eye wash bowl.
3. Spray head: Solid brass, built-in stainless steel filter to remove inpurities from water
4. Foot treadle stainless steel available: Activating eye wash valve(Non-standard Supply)
*Method of application:
1. Please pull down the pull rob, when you need shower, and the shower valve will open; push up the shower switch, the shower valve will close.
2. Please push the board clockwise, when you need eye washing, and the facility will work, pullback the push board withershins, eye wash valve close.
3. The silt, residue flax, iron and other debris in the pipeline must be cleared before installation, avoid to block sprayer head or damaged sealing parts, causing the valve could not close strictly.
*Maintenance
1. Should using the facility above zero environments, and you should notice the pipeline antifreeze if used in the cold place.
2. Please clean the inert pipeline before installation.
3. suggest to install the main valve in the inlet pipe, close the main valve first after using, and close the shower/eye wash valve when clear up the remain water.
Packing: Carton
Shipping: within 30 days after receive the deposit
Research and manufacture development is the purpose we always follow for years, and also enjoy providing customer-oriented services , in particular any ODM/OEMbusiness. We also provide services:
When we begin to cooperation, we will provide the following services for you
1,Completely according to your request to production of goods for each one.
2,Report the production progress at any time, and send pictures to you to check.
3,Packing like picture. the packaging is solid and firm. Cartons will be printed on your company's information, can be done without any information of our company if you need.
4,Have corresponding label on each product of the packaging , it is easy to put and installation.
5,Documents provided accurately.
6,Follow up the shipping company information at any time, to remind the time of arrival.
7,After receiving the goods, we will send you the installation video or installation drawing, solve any problems for you at any time.
Please feel free to contact us !