clean room equipment, it is suitable for electronic, medicine, living beings, food, optics, etc.
Negotiable /Square Meter
Min.Order:500 Square Meters
Yifeng Clean Technology Jiang Su Shares Co., Ltd.
clean room
clean lab clean room portable clean room sandwich panel clean room
Clean room refers to a certain space range of micro particles in the air, harmful air pollutants such as bacteria, the excluded, and will indoor temperature, cleanliness, indoor pressure, air velocity and air distribution, noise, vibration and lighting, static control in a certain range, and the demand for special design of the room.
1. Ceiling system: Include the ceiling rod,I-beam or B-beam,ceiling grid or ceiling frame.
2. Air conditioning system : Air cabin,air filter system,windmill.
3. Partitional wall: Include window,door.
4.Floor: include the raised ventilation florr or static floor,epoxy self-leveling and rolling floor.
5.Luminaire : include daylight lamp,yellow lamp tube.
clean room partitions Clean Room Construction clean lab clean room portable clean room
6. The clean room construction main body structure: The general material is steel or bone cement,but whatever what structure,which meeting the following conditions.
A. No cracking because of change of temperature and vibration.
B. It isn't easy to appear dust particles,and difficult to adhere to partical.
C. Hygroscopicity small
D. In order to maintain indoor humidity conditions,the heat insulation too high.
Definition of cleanse:
Smear exists during processing or handling objects will affect the success rate, while controlling the smear on the processing object will increase the success rate. Technology of cleanse and tarnish control, usually called as tarnish control in international, is a technique to control such smears (also including treatment and isolation of harmful substances in the processing or handling objects).
Manipulation of clean air:
Air from outdoor is processed by early effect segment, mixed with indoor return air, and then filtrated by middle effect segment, high effect segment to clean room, to control the number of particles in the air below a certain number.
Air can also be manipulated by heating, cooling, humidification, dehumidification, sterilization and et al, to receive certain state like sterile, constant temperature and humidity.
According to the clean-level, indoor air can be organized in a manner laminar, turbulent flow and mixing.
Clean possession of state:
Empty: Facilities have been completed, all connected to power supply and run, but no production equipment, materials and staff
Dynamic: Facilities have been completed, production equipment has been installed, operation under agree ment of business and vendors agree, but no staff.
Static: Facilities run under stated condition, the presence of stated person and work under promissory state.
We kindly needs following information to design your clean room
The structure parts:
1. Panel style:
Metal-face polyurethane core board,
Metal-face rockwool core board (widely used),
Metal-face polystyrene core board (without fire proof),
Metal-Face Honeycomb Core Board,
Metal-Face Plastered Core Board (widely used for ceiling),
Metal-face glass-magnesium core board.
Panel thickness: 50mm,70mm and 100mm
Panel Height: according to customer request
2. Door shape and window shape and quantities
3. Ornament material: circle 50 degree, 75 degree, alloy aluminum, silver color or painted color.
4. Layout drawings
5. The house structure: steel structure or ferroconcrete
Air conditioner and air fan parts
1. The technical height(the height between ceiling to girder lower point)
2. Air feeding duct and air sucking duct direction and arrangement
3. The clean grade request, temperature and humidity request, pressure balance request, wind speed request.
4. Air exhaust request and air exhaust quantity request
5. Workers quantity and equipments heat generating amount
6. Air conditioner or air fan brand and style request:
Water cooling or fan cooling?
Equipment parts:
1.The air shower room specification and material request.
2.The pass box specification and material, technical request.
3.Laminar flow specification and request
4.Weight room specification and request
5. FFU specification and request
Electricity Parts
1.Clean room illumination request, clean light style
2.Total power
3. Control style (full auto/manual)
4. Wire hidden style (pretreatment/hidden in sandwich board)
Floor parts:
1.The cement basic (the cement floor intension and flat degree)
2.Floor request (PVC/roller/plate static proof request, epoxy color)
Our service:
1) 7*24h online service, warmest and the most patient.
2) samples are free but the fees for transportation should be in your charge.
3) installation,technology support and training by extra.
4) post-sale service by extra
1.Payment:
(1) T/T, L/C are acceptable.
(2) Price Term: FOB Shanghai.
2.Pls feel freely to contact us.