Economic mobile flat roof prefab house structure firm house made in China
USD $45 - $85 /Square Meter
Min.Order:100 Square Meters
Shandong Heya International Trade Co., Ltd.
PRODUCT PHOTO
Main Material of Prefab Houses: | |
A. | The roof and wall is sandwich panel. However, there are other materials you can choose, such as the rock wool sandwich panel, polyurethane sandwich panel, PU foam sandwich panel. |
B. | The frame is the C section steel and the angle iron. The thickness is depending on you! |
More details of Prefab Houses: | |
A. | Structure: light steel as its main frame, which is safe and reliable; sandwich panels as its roof and wall boards, which is in equisite looks and beautiful decoration. |
B. | Environmental protection and economized: prefab houses are reasonable in design, can be removed or recycled more than 5 times, and it can service 10 years or longer. |
C. | Applications: prefab houses can be used as permanent & temporary residence, laborers accommodation, office, workshop, warehouse, etc. |
D. | Advantages: High performance in quakeproof, waterproof, windproof, moisture proof, heat insulation and sound insulation. |
E. | Inside facilities: Floorings, ceiling, water system, electrics, toilets, etc. are optional for clients' choice. |
F. | Quick installation: It is convenient to install, a skilled worker can install 20sqm-30sqm one day. |
G. | Transportation: The completely knock-down of prefab house components can save more space of the sea container and make the freight cost of house much lower. |
Other Points: | |
A. | Prefab houses can be used in building site, low cost, easy installation, reusable, energy conservation. |
B. | Used in building site and can be reused in lots of projects, which is very economical. |
C. | Prefab houses can be designed as accommodation, office, control center, canteen and so on. |
D. | The low-cost, easy assemble and disassemble, reusable are the most outstanding advantages of this house. |
E. | We can design the style according to your different requirements and the building site weathers. It's fireproof, waterproof, quakeproof and heatproof. |
F. | The partition of the wall is depend on you, we can design what partition you want. |
G. | Excellent in the feature of typhoon and earthquake proofing grade is 8 grades. |
H. | The using life is around 15-25 years. Environmental protection and economical. |
I. | 6 worker can assemble 20~30 square meters every day. 6 workers can finish 300sqm prefab house in 2 days. |
J. | Loading: 180 square meters can be loaded in one 40 feet shipping container. |
Delivery by 40'HQ shipping container by bulk packing in general .
Packaging
| Mixed packaging:roof frame and bottom frame will be packed together with bolts;all the wall panels packed together with wooden pallet in the bottom,corrugated board on the surface,and XPS board in the interspace. And it will be shipped in 40’ container . |
Unloading
| 40 feet ocean freight container: |
A: Take out the small packages. | |
B: Use folk lift to take out the wall panel packages. | |
C: Grapple the corner on bottom side of the container house and drage the package out,remain about 50cm in the shipping container. | |
D: Use folk lift to lift the container package in the middle and move it out of the shipping container. | |
E: Put the package on ground sidewise, use wooden pad if it’s flatwise. |
Our Heya International Trade Co.,Ltd.(Heya Group) is one of the largest manufacturers of the prefabricated house,flat pack container house,steel villas, and steel structure warehouse in China. We have been doing well in this field for more than 21 years,and we have exported our products to more than 90 countries as well as our domestic market with ISO9001,CE and SGS approval.Heya Group is a supplier of the series products for the country’s key projects,such as the Olympic Sailing Center,bay bridge of Jiaozhou Gulf,Qingdao cross sea tunnel,etc.
A. Professional design and engineering team: Full solution for steel structure design.
B. Procurement and Manufacture for all material for prefabricated building. We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO/CE/SGS standard, to make sure the fabrication works with high technology.
C.Site management & Installation supervision, We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be O.K.
1.OEM services
2.Professional design
3.A timely quotation
4.Delivery within 10 workdays
For client’s information: | |
It will be very much helpful if clients can provide the following information: | |
A. | Design drawing or layout plan if you have. |
B. | The dimension:length,width,height,windows and doors dimensions,etc. |
C. | The function of building,and if need,the interior equipment etc. |
D. | The class of building:one,two or three story. |
E. | Specialrequirement on function:such as water system,electricity installation, or other requirements etc. |
YOU MAY LIKE