Choke manifold

Choke manifold

Negotiable /Set

Min.Order:1 Set

Supply Ability:
2000 Set / Sets per Month
Port:
China main ports
Payment Terms:
T/T L/C D/P D/A

Quick Details View All >

Place of Origin:
China
Brand Name:
Senwell
Type:
Other, Choke manifold
Machine Type:
Other, Well control system
Certification:
API
Use:
Well Drilling

Shaanxi Senwell Import & Export Co., Ltd.

Business Type: Trading Company
Shaanxi China
Main Products: API drill pipeHWDP ,Drill collar ,StabilizerForging ,API casing&tubing ,Hole opener

Product Details

Specifications

1.API spec 16C standard
2.Material: AA, BB, CC, EE, FF
3.Working Medium: Gas, crude, drilling fluid

1. Application
Choke manifold is necessary device to control the well kick successfully and execute the pressure control technology on oil/gas well in the course of drilling. In fact, the device is adopted to execute new drilling-wells technique of balance pressure, which can prevent the pollution of oil-layer, improve the speed of drilling and control blowout effectively. One end of the device connects with the side flange of BOP spool. When BOP closes, it can control the finite pressure from casing by adjusting the choke valves opening, so balanced drilling can work under minimum pressure-difference.

 

2. Assembly & structure
Choke manifold consists of choke valve, gate valve, pipeline, fittings and pressure gauge etc.

 

3. Working principle
When the pressure rising in well, fluid in well can be released in utilization of the choke valve opening/closing in choke manifold to control casing pressure, which can directly blow out through gate valve as the casing pressure is quite high.

 

4. Specification
Pressure level is divided into five levels, i.e. 2,000psi, 3,000psi, 5,000psi, 10,000psi, 15,000psi; it can be designed according to the requirement of customer.

 

5. Operation requirements
(1) All the working pressures of parts in choke manifold should be matched with the working pressure of the BOP stack used.
(2) Choke manifold should be installed at the place where operator approach it conveniently, pressure test should be executed as installation, while the sealing test pressure should equal to the rated working pressure;
(3) Pipeline should be so smooth and straight as possible, the corner of the pipeline should be made of 120°shaped forged steel bent pipe, which should have adequately large bore.
(4) The working pressure gauge should be installed.
(5) In winter, the choke manifold be able to work under a low temp condition.

 

Note:

Working pressure: 2,000psi - 15,000psi

Nominal bore size: 2 1/16 to 4 1/16

Level: PSL1~PSL4

Material: AA, BB, CC, EE, FF

Performance level: PR1~PR2

Working Medium: Gas, crude, drilling fluid

Contact Supplier

Ms. Jenny Zhang General Manager Chat Now
Telephone
86-29-85370919
Fax
86-29-85370919
Address
RM30802,CHANGFENG PARK,XISANYAO,YANTA DISTRICT,XI'AN,P.R.CHINA Shaanxi

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Energy & Mineral Equipment > Mining Machinery > Mining Machine Parts
Categories
Hi~