China economic fabric aircraft hangars
USD $35 - $85 /Square Meter
Min.Order:500 Square Meters
Qingdao Xinguangzheng Steel Structure Co., Ltd.
|
China economic fabric aircraft hangars
1. China economic fabric aircraft hangars easy installation ,low price, high strength
2. China economic fabric aircraft hangars environmental protection , be recycled.
3. China economic fabric aircraft hangars save space ,durative up to 50 years .
China economic fabric aircraft hangars details:
Material | Specification |
Length | Single slope, double slope, muti slope |
Width | Single span, double-span, Multi-span |
Height | single floor, double floors |
Column | Q235, Q345 welded H section steel |
Beam | Q235, Q345 welded H section steel |
Purlin | Q235 C channel or Z channel |
Knee brace | Q235 angle steel |
Vertical and transversal support | Q235 angle steel, round bar or steel pipe |
Tie bar | Q235 steel pipe |
Brace | Q235 round bar |
Cladding system | EPS, PU, Fiber glass wool sandwich panels or corrugated steel sheet with fiber glass wool insulation. available in Diferent colors&gauge |
Partition wall | sandwich panels (EPS, PU, Fiber glass wool etc.) available in Diferent colors&gauges |
Door | sandwich panel sliding door or roller door |
Gutter | stainless steel or color steel sheet |
Rainspout: | PVC |
Live load on roof | In 120kg/Sqm (Color steel panel surrounded) |
Wind resistance grade | 12 grades |
Earthquake-resistance | 8 - 9 grades |
Structure usage | Up to 50 years |
Finishing options | vast array of colors and textures available |
Paint Options | Gray paint, red paint, white paint, expoxy zinc etc. Or Galvanized |
China economic fabric aircraft hangars steel structure
FOLLOWING China economic fabric aircraft hangars PICTURES:
China economic metal hanga equipment :
China economic fabric aircraft hangars
first step:design(software:pkpm ,3d3s):
China economic fabric aircraft hangars
second step:details design(software: tekla , CAD )
China economic fabric aircraft hangars
third step: cutting,welding,assembling.
China economic fabric aircraft hangars
forth step:shipment packing .
China economic fabric aircraft hangars
fifth step:installation project .
1. ASK:If I would like to ask you design China economic metal hangar for, what information shall I provide?
ANW:The basic information is wind speed, earthquake magnitude and snow load, and your requirements for window, door, wall and roof cladding.
2.ASK: If I provide you China economic metal hangar drawing, can you convert it into equal structural steel in your standard and quote me?
ANW:Yes, we can.
3.ASK:What is your delivery China economic metal hangar time?
ANW: within 45days for a 10000Sqm project.
4.What is your payment term?
ANW: T/T and L/C.
You will pay 30% advanced payment before production, and balance the rest 70% payment when goods are ready for shipment.