High power LED flood light / outdoor led floodlight / sensor flood light
USD $10 - $100 /Piece
Min.Order:10 Pieces
Shenzhen Heguang Lighting Co., Ltd.
High power LED flood light / outdoor led floodlight / sensor flood light
10W-100W Energy Saving Flood light LED | |||||
Item No. | HG-FL-10W | HG-FL-20W | HG-FL-30W | HG-FL-50W | HG-FL-100W |
Power | 10±0.5W 6±0.5W(Red) | 23±0.5W 17±0.5W(Red) | 33±0.5W 23±0.5W(Red) | 53±0.5W 44±0.5W(Red) | 100±0.5W 80±0.5W(Red) |
Lumem | 650±5%Lm(White) 240±5%Lm(R) 300±5%Lm(G) 90±5%Lm(B) | 1500±5%Lm(White) 450±5%Lm(R) 740±5%Lm(G) 200±5%Lm(B) | 2200±5%Lm(White) 650±5%Lm(R) 1100±5%Lm(G) 270±5%Lm(B) | 4000±5%Lm(White) 1000±5%Lm(R) 1500±5%Lm(G) 400±5%Lm(B) | 8000±5%Lm(White) 2500±5%Lm(R) 3000±5%Lm(G) 900±5%Lm(B) |
Light Source | COB 10W | COB 20W | COB 30W | COB 50W | COB 100W |
Size | 104 x 86 x 110mm | 180 x 140 x 130mm | 270 x 188 x 158mm | 286 x 235 x 173mm | 286 x 360 x 187mm |
Certificate | CE and RoHS | ||||
Waterproof Rank | IP65 | ||||
Lifespan | 30000 hours | ||||
Working Temperature | -20-60° | ||||
Beam Angle | 120° | ||||
LED Chip | Espitar (Origin: Taiwan) | ||||
Emitting Colors | Single white, red, green, blue, yellow | ||||
Working Voltage | 85-265V AC | ||||
Lamp Body Material | Aluminium with tough glass cover | ||||
Package Material | Inner white box with 6 sides foam,for shock-proof + outer carton box |
High power LED flood light / outdoor led floodlight / sensor flood light
Application:
1. Tunnel, Subway, Underground Lighting.
2. Gymnasium, Sports Stadium Lighting.
3. Building, Billboard Lighting.
4. Gas Station, Garage Lighting.
5. Park, Garden Lighting.
6. Workshop, Factory Lighting.
7. Warehouse, Storage Lighting.
8. Yard, Square Lighting.
9. Road, Highway Lighting.
10. Station, Dock Lighting etc.
High power LED flood light / outdoor led floodlight / sensor flood light
Installation issues:
1, Fix flood light on the mounting pole or mounting surface through mounting bracket holes with screws directly.
2, After fixing product, you can adjust screws on both sides to adjust the projection angle of light body.
3, When install lighting, please close well to wiring and wiring point to prevent leakage.
4, When connect external power cord, please take the appropriate waterproof, leakage measures.
5, Please keep any fire regulations.
6, Do not uninstall lamp by yourself to avoid light damage
Trade Terms: | ||||||
1.Payment : T/T or western Union | ||||||
2.Sample lead time: 7-10 days | ||||||
3.delivery time: for 100~500pcs:10-13days ;500~1000pcs 13-17days | ||||||
4.Shipping port :shenzhen ,China | ||||||
5.Quantity discount is available | ||||||
6.Minimum Quantity:100pcs-200pcs (maximum sample :1-10pcs) |
Factory: