Blow barrel mould
USD $10,000 - $10,009 /Set
Min.Order:1 Set
Taizhou Huangyan Xiongyi Plastic Mould Factory
Huangyan blow mould
We are Xiong yi specialized in making molding more than20 years, If you need more information,contact me by Email or Skype.
Skype:zhu.rong.jun
Gerneral mold specifications:
1.Name: blow mould
2.Steel of mould cavity&core :P20/718/2316/3CR13 etc
3.Steel of mould base :45#,50#,P20,etc
4.Nos of cavity:customized or according to the customers' requirement
5.Hardness of cavity&core:30-33HRC
6.Hardness of wear parts :30-33HRC
7.Core pulling system:motor /oil cylinder/stripping plate,angel,pin etc
8.Mould Accessories:DME/HASCO standard
9:Manufacture Process:Drawing/sample/product data --Agreement comment--Hand made sample--Design comment--Material purchase and Give product instuction--Material inspection and Mould design--Electrode process and Prorm--CNC,wire cut,EDM--Quality inspection--Finish machining cavity,core,jiggle pin--Quality inspectio--Match the moulds--Quality inspection--polishing--Quality innspection--Cautery veins,plate and Nitrification--Quality inspection--Moulds assembly --Quality inspetion --Try mould--Client approbate--Consignation/maufacture
10 Machining center: CNC milling machine -NC wire cutting -NC-EDM and so on
11 Mould life time:500000-1000000 shots,or according to the material of steel
12.Down payment:Usually 40%before we start working
13.R and D:We offer customers the drawings for products and mould structure
14.Confirmation:We send the drawings to cusomer to confirm and the customers give us some suggestions
15.Testing :Testing the mould to make sure everything is ok
16.Lead time:30-45days
17.Imported Steel ensured the long service life of the moulds
18.Rowerful cooling system ensured the product forming speed
19.Advanced computer simulation technology is adoped to analyze mould runner designing
20.Advanced High-precision equipments,High-class R&D team,and strict quality control managment ensured ensured the mould quality
Manufacturing Process
1.Quote | According to sample, drawings and size, Providing a reasonable price | |
↓ | ||
2.Discussion | Mold material, cavity number, price, runner, payment and delivery time | |
↓ | ||
3.S/C Signature | Approval for all the items | |
↓ | ||
4. Advance | Pay 40% by T/T advanced | |
↓ | ||
5.Product Design Checking | We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report. | |
↓ | ||
5.Mould Design | We make mould design on the basis of confirmed product design, and send to customer for confirmation. | |
↓ | ||
6.Mold Tooling | We start to make mold after mold design confirmed | |
↓ | ||
7.Mold Processing | Send report to customer once each week | |
↓ | ||
8.Mold Testing | Send trial samples and try-out report to customer for confirmation | |
↓ | ||
9. Mold Modification | According to customer’s feedback | |
↓ |
| |
10.Balance settlement | 60% by T/T after the customer approved the trial sample before shipment | |
↓ |
| |
11.Delivery | Delivery by sea or air. The forwarder can be designated by your side. |
Photos