Plastic garbage bin injection mould
USD $10,000 - $20,000 /Set
Min.Order:1 Set
Taizhou Huangyan Xiongyi Plastic Mould Factory
Plastic garbage bin description:
We are Xiong yi specialize in making molding more than for 20 years in Huangyan, Taizhou.
Description of mold
Runner | Hot/cold |
Mold material | P20/H13/718/2316 etc |
Mold size | / |
Cavity | 1 cavity |
Products material | ABS/PP |
Product size | dia280*h310mm |
Product weight | 270g |
Surface treatment | Polish |
Delivery time | 45 days |
Mold making process
Design(2 days)→Buy material(4 days)→CNC machining(15 days)→Assembling and Fitting(3 days)→Polishing(7 days)→Testing mold(2 days)
So usually we need at least 35 days to finish a mold,then start to test this mold.
Quality confirm
-- At the end of design, we will send the 3D-design to you, including the item picture.
--When test the mold, the DV will provide for you if you do not have time reach here.
--Before shipping,checking again.
Mold Packing
Antirust paint → Plastic film → Wooden case
Mold maintaining
--Spray the antirust when the mold is not use
--Make all the place clean
--Do not put it at sticky place
After Service
-- If the problem is not big, we can solve via internet or phone
-- Some question cannot settle by yours, we will send our engineer to fix the mold.
-- One year after-sale technique support
Mold picture
Product picture
Sample room