Plastic steering wheel blowing mold
USD $10,000 - $20,000 /Set
Min.Order:1 Set
Taizhou Huangyan Xiongyi Plastic Mould Factory
Plastic blow toy mold description:
We are Xiong yi specialized in making molding more than 20 years
Gerneral mold specifications:
1.Name: Plastic blow toy mold
2.Steel of mould cavity&core :P20 / 718 / 2136 etc
3.Steel of mould base :45#,50#,P20 etc
4.Nos of cavity:customized or according to the customers' requirement
6.Core pulling system:motor /oil cylinder/stripping plate,angel,pin etc
7.Mould Accessories:DME/HASCO standard
8:Manufacture Process:Drawing/sample/product data --Agreement comment--Hand made sample--Design comment--Material purchase and Give product instuction--Material inspection and Mould design--Electrode process and Prorm--CNC,wire cut,EDM--Quality inspection--Finish machining cavity,core,jiggle pin--Quality inspectio--Match the moulds--Quality inspection--polishing--Quality innspection--Cautery veins,plate and Nitrification--Quality inspection--Moulds assembly --Quality inspetion --Try mould--Client approbate--Consignation/maufacture
9 Machining center: CNC milling machine -NC wire cutting -NC-EDM and so on
10 Mould life time:500000-1000000 shots,or according to the material of steel
11.Down payment:Usually 40%before we start working
12.R and D:We offer customers the drawings for products and mould structure
13.Confirmation:We send the drawings to cusomer to confirm and the customers give us some suggestions
14.Testing :Testing the mould to make sure everything is ok
15.Lead time:45days
1.Quote | According to sample, drawings and size, Providing a reasonable price | |
↓ | ||
2.Discussion | Mold material, cavity number, price, runner, payment and delivery time | |
↓ | ||
3.S/C Signature | Approval for all the items | |
↓ | ||
4. Advance | Pay 40% by T/T advanced | |
↓ | ||
5.Product Design Checking | We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report. | |
↓ | ||
5.Mould Design | We make mould design on the basis of confirmed product design, and send to customer for confirmation. | |
↓ | ||
6.Mold Tooling | We start to make mold after mold design confirmed | |
↓ | ||
7.Mold Processing | Send report to customer once each week | |
↓ | ||
8.Mold Testing | Send trial samples and try-out report to customer for confirmation | |
↓ | ||
9. Mold Modification | According to customer’s feedback | |
↓ |
| |
10.Balance settlement | 60% by T/T after the customer approved the trial sample before shipment | |
↓ |
| |
11.Delivery | Delivery by sea or air. The forwarder can be designated by your side. |
Photos