walkboards and scaffolding plank(steel boards)
USD $800 - $1,400 /Twenty-Foot Container
Min.Order:1 Twenty-Foot Container
Tangshan Fengnan Shuangying Metal Structure Factory
steel plank can replace timber or bamboo plank, construction workers can walk on that.There are many different sizes and materials of the steel plank, we can make that products according to the customer's requirements
1.Meterial:Q195, Q235
2. Hook:with or without
3.Surface treatment:pre-galvanised, electro galvanized or hot dip galvanised
5.Technic:Welded
6.Color:Self-color(Black) , Silver
7.Package:in bundle
8.can make as customer's drawing
9.walkboards,scaffolding sheets,steel board,metal decking,galvanized metal deck,steel scaffold plank
We can supply all kinds of galvanized steel plank with hole and without hole
Name | Size | Unit Weight kg/piece | Quantity Pieces/40HQ |
Steel Plank | 250*50*1.2mm*4m | 17.07 | 1260 |
Steel Plank | 250*50*1.2mm*3m | 12.81 | 1700 |
Steel Plank | 250*50*1.2mm*2m | 8.53 | 2520 |
Steel Plank | 250*50*1.2mm*1m | 4.76 | 5000 |