Steel cold forming equipments, z purline steel profile forming equipment
USD $15,000.5 - $26,000.5 /Set
Min.Order:1 Set
Hebei Feixiang Roll Forming Machinery Co., Ltd.
Steel cold forming equipments,z purline steel profile forming equipment
Features:
z purline steel profile forming equipment
1.Light weight,environmenttal protection and economical
2.Durability and life-long used with high efficiency
3.Easy installed and operate
4.Nice appearance and fashion style
1.Product display :
z purline steel profile forming equipment
2.Components and Processing flow diagram :
3.Technical parameters :
z purline steel profile forming equipment
NO. | ITEM | PARAMETER | |
1 | Material | type | GI,PPGI |
Width | 190-420mm | ||
thickness | 0.5-3mm | ||
Yield stress | 350-550Mpa | ||
2 | Product | Cover width | 80-300mm |
Wave height | 80-300mm | ||
Pitch width | 40-80mm | ||
3 | Decolier | Type | Automatic with coil car |
Suitable coil OD/ID | 1200/250-508mm | ||
Max coil width | 1000mm | ||
Max capacity | 5T | ||
4 | Levelling parts | roller | Diameter:90mm |
No.45 steel with quenching | |||
Forming stand | 15 | ||
5 | Punching parts | Type | Hydraulic punching |
Model material | GCr12 | ||
6 | Main machine | Roller | 90mm |
GCr15 chrome plated | |||
Main machine structure | Guide column or wallboard | ||
7 | Power requirement | Main motor | 7.5kw |
Hydraulic pump | 4kw |
4. Note for use and maintenance
1),before use,you must check whether all connections are steady,whether bolts and nuts are tightinstallation.when start the machine,you must make sure there are enough lubrication oil in the case.
2),when start the machine commissioning,the machine should run idle,then check it carefully such as noise,vibration and whether the oil window works smoothly,whether every parts movement coordination.
3),You must cut off power when install the mould,move the motor belt and big gear by hand,turn the workbench and make sure the slide up to the highest point.
For keel roll forming machine,pls click here;
For floor deck making machine,click here;
1.Package standard :
Control box and easy damage parts: protective paper and waterproof packaging material,or wooden boxes .
Main forming device: waterproof material
Hydraulic pump and spare parts: paper boxes with waterproof material.
2.Delivery
We will arrange the shipment within 30 working days upon confirmation of purchasing order or recepit of deposit.
HEBEI FEIXIANG ROLL FORMING MACHINERY CO.,LTD:
1.Two decades professional cold steel forming equipments manufacturer
2.One comapny with two factory,about 30000 square meter,more than 100 employees
3.National GB/T,CE,ISO9001:2008 Certificates
4.Built business relationship with customers from more than 65 countries and areas
Pls feel free to contact me:
Why choose FEIXIANG?
*We supply all the technical support,such as engineers,drawings,and instruction manual.
*We send one or more than one engineers to client for installing and adjust all the machinery
*Supply formula guide service and staple raw material purchase.
*We could supply turnkey project to you.
*We have good reputation from our customers both at home and abroad.