aluminium pipe for automobile bumper
USD $2,500 - $3,800 /Kilogram
Min.Order:1000 Kilograms
Shanghai Ruiyi Metal Co., Ltd.
Product Description | |||
Product | aluminium pipe for automobile bumper | ||
Alloy | 3003/6005/6060/6063/6061/6082/6463/7003 | ||
Temper | O/T4/T5/T6 | ||
Surface Treatment | Mill Finished/Anodized/Powder coated/imitated wooden etc | ||
Quality | 1.ISO9001 | CN-00209Q11056R0L | |
2.ISO14001 | CN-00209E2026R0L | ||
3.OHSAS18001 | CN-00209S10153R0L | ||
4.TS16949 | CNH-S-13261/TS | ||
Usage | Widely used in Construction and industry | ||
Our Advantage | One stop service:Design-Making mold-Extruding-Machining-Packing-Delivery | ||
Packaging & Shipping | |||
Packaging | 1.Inner packging by shrink film and outer kraft | ||
2. Carton or Wooden Pallet | |||
Shipping | 1.By Sea | ||
2.TNT,DHL,FedEx | |||
Production Capacity | |||
Max production capacity(tons/year) | 150000 | ||
Extrusion equipment | Max | Min | Quantity |
5500 Tonnage | 600 Tonnage | 28 sets | |
Shifts per Day | 3 shifts | ||
CNC Machine | 32 sets | ||
Punching Machine | 40 sets | ||
12 meter long CNC Machine | 3 sets | ||
Drilling Machine | 15 sets | ||
Anodized Line | 2 sets | ||
Powder coated Line | 2 sets | ||
Imitated Wooden Line | 2 sets | ||
Thermal Isulation Line | 2 sets | ||
IV. Production capacity | ||||
Total maxium production capacity (Tons) | 150,000 | |||
Actual annual production (Tons in 2010) | 130,000 | |||
How many shifts per day do you operate? | 3 shifts | |||
How many days of production per year? | 365 days | |||
How many years of experience do you have producing Extruded aluminum? | 31 years | |||
Max | Average | Min | ||
What is the Tonnage range of your Extrusion equipment? | 5500 tonnage | 1600 tonnage | 600 tonnage | |
Max | Average | Min | ||
What is the length range of extruded aluminum that you can produce? | 28000mm | 6000mm | 3000mm | |
Do you have experience extruding the following Aluminum materials? (Y/N) | Material | Y/N | If No, please recommend material. | |
6060 T6 | Y | |||
Do you have long-term contract with your key material suppliers? (Y/N) | Y | |||
V. Engineering and Molding | ||||
Do you have engineering capability in-house? (Y/N) | Yes | |||
Can you handle engineering drawings on 3D-CAD? (Y/N) | Yes | |||
If yes, which formats of engineering drawings can you provide? | SOLID WORK | |||
Do you have prototyping/sample production capability in-house?(Y/N) | Yes | |||
Can you produce extrusion molds in-house? (Y/N) | Yes | |||
VI. Production Equipment | ||||
If in-house | ||||
Please respond to questions for the following equipments | In-house or Subcontracted | Description model and number of Production Equipment | ||
Ingots heating | In-house | 28 | ||
Extrusion | In-house | 28 | ||
1st cutting | In-house | 36 | ||
T6 heat treatment | In-house | 30 | ||
2nd cutting | In-house | 13 | ||
CNC bending | In-house | 2 | ||
Punching | In-house | 12 | ||
CNC | In-house | 10 | ||
Anodization | In-house | 2 | ||
Please specify other equipments: | In-house | Many | ||
Powder coating | In-house | 4 |
VII. Quality, Environmental and Product Certification | ||||
Certificate | Date of Certificate | Certificate number | Certifying Org. | |
What quality and environmental registrations do you have? | ISO9001 | 2009/3/6 | CN-00209Q11056R0L | CQM Certificate |
ISO14001 | 2009/3/6 | CN-00209E2026R0L | CQM Certificate | |
OHSAS18001 | 2009/3/6 | CN-00209S10153R0L | CQM Certificate | |
Y | ||||
VIII. Quality Control and Testing Equipment | ||||
Testing Equipment | Yes/No | |||
What quality control equipment do you have in-house? | Portbale hardness test pincer | YES | ||
hardness test machine | YES | |||
Material Analysis | YES | |||
Tensile Test Equipment | YES | |||
chemical test Lab | YES | |||
Please specify other equipments | YES |