two-jaw hydraulic grab,grab bucket
USD $2,000 - $10,000 /Unit
Min.Order:1 Unit
Wuxi Golink Engineering Machinery Co., Ltd.
low price e china manufacture coal staker-reclaimer with walking structure
widely used low price ce approved high efficient stacker machine
700t/hour china manufacture factory price ISO approved stacker machine
widely used low price china manufacture coal stacker reclaimer
widely used low price new design china manufacture rubber conveyor belt stacker reclaimer
GLE grab is used for building the base of the foundation pit digging mining, pit mining, gravel and clay, sand, coal loading. Particularly applicable to ditch or restricted space on one side of the excavation and loading. Apply to port ship, train and car.
1.With double oil cylinders drive and high strength steel production.
2.With big closing force, excellent mining properties,and high work efficiency.
3. Hydraulic turning points according to the customers' demand, without hydraulic rotary excavator grab use the oil cylinder or standby line, don't need to add other hydraulic valve block and line.
4. Rotary hydraulic excavator grab need add another set of hydraulic valve and pipeline to control, oil cylinder makes the piston protective device
Type
| Weihgt | Volume m3 | Density | SWL t | Size (mm) | ||||
|
|
|
|
| A | B | C | D | E |
HBG400-1 | 560 | 0.4 | 0.4-1.2 | 5 | 1260 | 810 | 1100 | 1350 | 950 |
HBG500-1 | 650 | 0.5 | 0.4-1.2 | 6.25 | 1350 | 870 | 1200 | 1460 | 1020 |
HBG630-1 | 770 | 0.63 | 0.4-1.2 | 7.6 | 1450 | 930 | 1290 | 1570 | 1100 |
HBG800-1 | 920 | 0.8 | 0.4-1.2 | 9.4 | 1510 | 960 | 1340 | 1635 | 1250 |
HBG1000-1 | 1070 | 1.0 | 0.4-1.2 | 11.34 | 1620 | 1030 | 1880 | 1760 | 1360 |
HBG1250-1 | 1240 | 1.25 | 0.4-1.2 | 13.7 | 1740 | 1100 | 1450 | 1895 | 1450 |
HBG1600-1 | 1500 | 1.6 | 0.4-1.2 | 17.1 | 1890 | 1560 | 1690 | 2060 | 1580 |
Standard wooden cases or as customers’ demands
1.Pre-sale services:
a: Design customised project for clients.
b: Design and manufcture products according to clients special requirement.
c: Train technical personnel for clients.
2.Services during the sale:
a: Help clients to find reasonable freight forwarders
ahead of delivery.
b: Help clients to draw solving plans.
3.After-sale services:
a:Assist clients to prepare for the construction scheme.
b:Install and debug equipment.
c:Train the first-lin operators.
d: Examine equipment.
e: Take initiative to eliminate the troubles immediately.
f:Provide techical exchanging.