Scaffolding Screw Base Jack
USD $1 - $10 /Piece
Min.Order:500 Pieces
Cangzhou Longquan Ductile Casting Co., Ltd.
Scaffolding Screw Base Jack
Scaffolding Screw Base Jack SPECIFICATIONS
1)Solid bar
a) length:300,400mm,600m,800m etc.
b) O.D.:28mm,30mm,32mm,34mm,38mm
2)Hollow tube:
a) length:300,400mm,600m,800m etc.
b)O.D.:36mm,38mm,40mm,48mm
Both the solid bar or hollow tube jack base can be with or without U-Head
3) surface: Powerder coating, white galvanized or Black finish
Scaffolding Screw Base Jack -Adjustable Base Jack
Pipe | Plate |
M30(Solid) x 600mm | 120mm x 120mm x 4mm |
M32(Solid) x 600mm | 140mm x 140mm x 4mm |
M34(Solid) x 600mm | 150mm x 150mm x 6mm |
38(Hollow) x 4 x 600mm | 120mm x 120mm x 5mm |
Scaffolding Screw Base Jack -Adjustable Up U-Head Jack
Pipe | U-Head |
M30(Solid) x 600mm | 120mm x 100mm x 45mm x 4mm |
M32(Solid) x 600mm | 150mm x 120mm x 50mm x 4.5mm |
M34(Solid) x 600mm | 150mm x 150mm x 50mm x 6mm |
38(Hollow) x 4 x 600mm | 120mm x 120mm x 30mm x 3mm |
Scaffolding Screw Base Jack -Nut
Nut | Weight |
Nut Type A | 0.2KG |
Nut Type B | 0.25KG |
Nut Type C | 0.3KG |
Nut Type D | 0.4KG |
Scaffolding Screw Base Jack -Hollow
Leading screw | U shape plate | Jack nut | Total weight |
34×4×400mm | 150×120×50×5mm | 0.55kg | 2.91kg |
34×4×600mm | 150×120×50×5mm | 0.55kg | 3.739kg |
38×4×400mm | 150×150×50×6mm | 0.50kg | 3.607kg |
38×4×600mm | 150×150×50×6mm | 0.50kg | 4.278kg |
38×4×780mm | 150×150×50×6mm | 0.50kg | 4.881kg |
48×4/5×600mm | 150×150×50×8mm | 1.0kg | 6.241/6.818kg |
48×4/5×820mm | 150×150×50×8mm | 1.0kg | 7.195/7.984kg |
Scaffolding Screw Base Jack -Solid
Leading screw | U shape plate | Jack nut | Total weight |
30×600mm | 150×120×50×4/5mm | 0.25kg | 4.092/4.327kg |
32×600mm | 150×120×50×4/5mm | 0.30kg | 4.572/4.807kg |
34×600mm | 150×120×50×4/5mm | 0.40kg | 5.132/5.367kg |
30×400mm | 150×120×50×4/5mm | 0.25kg | 3.126/3.361kg |
32×400mm | 150×120×50×4/5mm | 0.30kg | 3.463/3.698kg |
34×400mm | 150×120×50×4/5mm | 0.40kg | 3.869/4.104kg |
Scaffolding Screw Base Jack SHOW
Scaffolding Screw Base Jack PRODUCTS PROCESS
Scaffolding Screw Base Jack PACKING & SHIPPING
♥ Your reply will be replied within 12 hours.
♥ Fast delivery time and good after service.
♥ Keep the mass production as the sample in high quality
♥ Freight forwarder: faster, safer, and convenient.
♥ Good factory price.