E355 cold finished precision seamless pipes
USD $800 - $1,250 /Metric Ton
Min.Order:5 Metric Tons
Yantai Xinpeng Steel Pipe Co., Ltd.
About our company:
Yantai Xinpeng Steel Pipe Co.,Ltd,located in (APEC)Science&Technology Industrial Park,Zhifu district,Yantai.Established in Dec1992,with registered capital of 5 million Yuan.Our company mainly produces various specifications of cold finished precision steel pipe,which are widely used in hydraulic and pneumatic cylinder for automobile,engineering machinery,textile machinery,printing machinery,oil drilling and other field.
In 2002,our company was equipped one set advanced CNC skived and roller burnished machine SRB-6000mm,several powerful honed machine,combined cold drawn,cold rolling,heat treatment and SRB process to produce the best quality products.our company has passed ISO9001 verified from 2008.
Commodity Description:
Name | E355 cold finished precision seamless pipes |
Delivery condition | BK,BKW,GBK,NBK,BKS |
Size | OD:25mm-300mm WT:2mm-30mm |
Length | according to the clients' request |
Materia | 10#,20#, 45#,25Mn,E355(Q345B, St52),27SiMn |
Standard | GB/T8713,GB/T3639,DIN2391,EN10305,ASTMA519, ASTMA106-2006 |
ID tolerance | H8,H9 |
MOQ | 5MT |
Package | Bulk in master cartons, then on pallets, |
or according to customers' requirement | |
Place of Origin | Shandong,China |
Payment | L/C or T/T (30% in advance and 70& against the copy of B/L) |
Delivery | Within 20 days after confirming the deposit |
Working Method | Cold drawn/rolled, honed/SRB, polished |
Delivery condition:
1.NBK(+N)
after cold forming, eventually above phase transition point, in a protective atmosphere of annealing oxidation medium
2. GBK(+A)
after cold forming, annealing in non oxidizing medium protective gas
3. BK(+C)
the final heat treatment after cold forming, therefore small steel pipe plastically, the plastically degree does not guarantee
4. BKW(+LC)
after final heat treatment, a tiny cold drawing deformation, continue again when machining steel pipe allowed inside certain limits cold deformation(bending, flaring)
5. BKS(+SR)
have a stress relief after cold forming, heat treatment, steel pipe can be carried out within a certain limit in the appropriate processing again
Product Process:
Application:
Our workshop and products:
High Efficiency Service
1.365Days *24Hours phone and email in service.
2.Your inquiry will be replied in 24 hours
Choose Xinpeng,inquiry me to get best price.