bailey bridges for hire

bailey bridges for hire

USD $1,000 - $1,500 /Set

Min.Order:1 Set

Supply Ability:
2600 Ton / Tons per Month
Port:
Shanghai
Payment Terms:
T/T

Quick Details View All >

Standard:
ASTM, GB
Grade:
Q345B
Place of Origin:
Jiangsu, China
Brand Name:
JSZY
Type:
Heavy
Application:
Steel Structure Bridge

Jiangsu Zhongye Traffic Engineering Co., Ltd.

Business Type: Manufacturer,Trading Company
Zhenjiang Jiangsu China
Main Products: Bailey Bridge ,Steel Bridge ,portable bridge ,temporary bridge

Product Details

Specifications

1.military structed
nveniently-transported
3.rapid erection/easy assembled/fast installed
4 huge load

5.Long service life 

6.Strong corrosin resistance

 

Bailey Bridge is a standard bridge equipment, adopted extensively and the most popular in the world, possessing the

features of simple structure, convenient transport, speedy erection and easy disassembling, while having the

advantage of heavy loading capacity, great stability and long fatigue life being capable of an alternative span, loading

capacity and mixture form to erect all kinds of Temporary Bridges, Emergency Bridges and Fixed Bridges. Using the

bridge equipment, the suspension bridges of varied span can be erected. The bridge has the advantages of few

components, light weight and low cost. Bailey bridge is similarly like compact 100,compact 200 International bridge. It

is assembled by each 3m panel, and invented by Donald Bailey. The 321 panel bridge can be easily dissembled and

rapidly erected. The whole bridge is made by high-tensile strength steel. Main beam is light weight panels and the

panels are connected by panel connection pins. It is easy to assemble or disassemble and transport. It can also be

assembled into different forms of panel bridges according to their span length and transportation requirement. So, it

has been widely applied as emergency transportation, temprary or permanent bridge.Its suitable load design is such

like HS-15, HS-20, HS-25 and pedrail-50 etc.

 

 

 

Span Construction-Load Table ---  Extra Single Lane (W=4200mm)  Span Construction-Load Table ---Double Lane (W=7350mm)
  SPAN-ftHS-15HS-20HS-25     SPAN-ftHS-15HS-20HS-25
30SSSSSS 30SSSSSS
40SSSSSS 40SSSSSS
50SSSSSS 50SSSSSSR
60SSSSSS 60SSSSRSSR
70SSSSSSR 70SSRSSRDS
80SSSSRSSR 80SSRDSDSR1
90SSRSSRSSR 90SSRHDSR1DSR2H
100SSRSSRSSR 100DSR1DSR2HTSR2
110SSRSSRDS 110DSR1DSR2QS
120SSRDSDSR1 120TSDSR2HTSR2
130DSDSR1DSR2H 130DSR2HTSR2TSR3
140DSR1DSR2HDSR3H 140TSR2TSR3TSR3H
150TSTSR2DSR2HDSR4H 150TSR3HTSR3HQSR4
160DSR2HDSR2HTSR2 160QSR4QSR4QSR4
170TSR2TSR2TSR3 170QSR4QSR4 
180TSR2TSR3TSR3H 180QSR4  
190TSR3HTSR3QSR4     
200QSR4TSR3QSR3 QSR4     

Remark:

1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc. 

2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced

  bailey bridges for hirebailey bridges for hire

 

Contact Supplier

Mr. hujun king General Manager Chat Now
Telephone
86-511-85575223
Mobile
18505118860
Fax
86-511-85575223
Address
7 Jinyang Road, Jingkou Industrial Zone Zhenjiang,Jiangsu

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Structures
Categories
Hi~