Post end (male,female)

Post end (male,female)

USD $128 - $176 /Set

Min.Order:1 Set

Supply Ability:
2500 Ton / Tons per Month
Port:
shanghai
Payment Terms:
T/T

Quick Details View All >

Standard:
GB, GB
Grade:
steel, Q345
Place of Origin:
Jiangsu, China
Brand Name:
jszy
Type:
Heavy
Application:
Steel Structure Bridge

Jiangsu Zhongye Traffic Engineering Co., Ltd.

Business Type: Manufacturer,Trading Company
Zhenjiang Jiangsu China
Main Products: Bailey Bridge ,Steel Bridge ,portable bridge ,temporary bridge

Product Details

Specifications

1,It is erected in the both of bridge, used to move the load to bridge bearing.
2,It can be dedicated into male and female.

 

Post end is placed in the two ends of the bridge, used for transmitting the bridge load to the bridge brace. End post comprises male and female. While installing, they are installed to the end respectively. The two holes on the side of the end post shall connect the upper and lower chord member of the truss frame, and the upper oval hole connects the second-floor truss; there are short cantilever and kinetic hasp with locating pin on the under-part of end post for setting and fixing transom. During long distance transport, move the kinetic hasp to the post inside and fasten with bolt. Saddle-shaped pad is welded to the post bottom for its locating on the axial girder.

 Post end (male,female)

 

Post end (male,female)

Contact Supplier

Mr. hujun king General Manager Chat Now
Telephone
86-511-85575223
Mobile
18505118860
Fax
86-511-85575223
Address
7 Jinyang Road, Jingkou Industrial Zone Zhenjiang,Jiangsu

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Structures
Categories
Hi~