25Mn mild carbon steel annealing tubes
25Mn mild carbon steel annealing tubes
25Mn mild carbon steel annealing tubes
25Mn mild carbon steel annealing tubes
25Mn mild carbon steel annealing tubes
25Mn mild carbon steel annealing tubes

25Mn mild carbon steel annealing tubes

USD $800 - $1,200 /Metric Ton

Min.Order:5 Metric Tons

Supply Ability:
600 Metric Ton / Metric Tons per Month
Port:
Qingdao or Chinese main port
Payment Terms:
T/T

Quick Details View All >

Thickness:
2, 30
Section Shape:
Round
Outer Diameter:
25 - 300 mm
Place of Origin:
Shandong, China
Secondary Or Not:
Non-secondary
Application:
Hydraulic Pipe

Yantai Xinpeng Steel Pipe Co., Ltd.

Business Type: Manufacturer,Trading Company
Yantai Shandong China
Main Products: hydraulic tube ,precision tube ,honed tube ,mechanical tube ,cold finished tube

Product Details

 

Commodity name

Cold finished seamless steel pipe

Dimension

OD:30-250mm,WT:2-30mm

 

Standard: GB/T8713, GB/T3639, DIN2391, EN10305, ASTMA519, ASTMA106-2006,      API 5L,etc

 

 

1.DIN Standard

 

10#(ST37-2,ST35-8),

20#(ST42,ST45-4/8),

45#(DIN CK45),

16mn(ST52.4) etc.

 

2.JIS standard:

10#(STPG38,STS38,STB30,STB33,Stb35), 20#(STPG42,STB42,STS42,JIS S20C),               45#(JIS S45C),                             16mn(STS49,STPT49) etc.

3.ASTM/AISI standard

10#(ASTM a106/53 Gr.B,A192,A179-C),     20#(ASTM A106/53 Gr.B, A178-C,A210-A-1,         A315-B,AISI1020),         45#(AISI1045),                                              16mn(ASTM A210-C) etc.

Technique

Cold drawing, cold rolling, hot rolling or hot expanding

Usage

Seamless steel pipes for low and medium pressure boiler, high pressure boiler, ship-building, liquid service , petroleum cracking, chemical fertilizer equipment ,drawing-oil-equipment and structure purposes.

Package

steel strip bundles, black paint coating, beveled ends or plain

Payment terms

L/C or T/T(30% deposit and 70% balance against B/L copy)

Delivery

FOB, CIF, CFR, etc

Shipment

15 working days after getting payment

 

 

Delivery condition:

 

after cold forming, eventually above phase transition point, in a protective atmosphere of annealing oxidation medium

 

2. GBK(+A)

 

after cold forming, annealing in non oxidizing medium protective gas

 

3. BK(+C)

 

the final heat treatment after cold forming, therefore small steel pipe plastically, the plastically degree does not guarantee

 

4. BKW(+LC)

 

after final heat treatment, a tiny cold drawing deformation, continue again when machining steel pipe allowed inside certain limits cold deformation(bending, flaring)

 

5. BKS(+SR)

 

have a stress relief after cold forming, heat treatment, steel pipe can be carried out within a certain limit in the appropriate processing again

 

 

ID Tolerance:

ID size

ID deviation (mm)

H7

H8

H9

H10

30

+0.021

0

+0.033

0

+0.052

0

+0.084

0

>30~50

+0.025

0

+0.039

0

+0.062

0

+0.100

0

>50~80

+0.030

0

+0.046

0

+0.074

0

+0.120

0

>80~120

+0.035

0

+0.054

0

+0.087

0

+0.140

0

>120~180

+0.040

0

 

+0.063

0

+0.100

0

+0.160

0

>180~250

+0.046

0

+0.072

0

+0.115

0

+0.185

0

>250~315

+0.052

0

+0.081

0

+0.130

0

+0.210

0

>315~400

+0.0527

0

+0.089

0

+0.140

0

+0.230

0

 

25Mn mild carbon steel annealing tubes

 


25Mn mild carbon steel annealing tubes

   25Mn mild carbon steel annealing tubes

  25Mn mild carbon steel annealing tubes

 

FAQ(Frequently Asked Questions)

 

 1.Where is your factory?

Our factory is located in APEC Science &Technology Industrial park, Zhifu District,Yantai,Shandong,China

2.What material do you have?

10#,20#,45#,25Mn,E355(Q345B,St52),27SiMn,etc.

3.When can I get the quotation ? 

within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or

tell us in your email so that we will regard your inquiry priority.

4. Can we get free samples ?

Yes, of course. After price confirmation, you can require for samples to check our quality counter display. 
samples are free, you only pay for freight charge is ok.

5. What is your terms of delivery and payment terms?

We accept EXW, FOB, CIF, etc; payment terms with L/C or T/T(30% deposit+70% balance against B/L copy)

You can choose the one which is the most convenient for you.

6. How about your delivery time?

Usually 15 working days after order confirmed& getting T/T deposit or original L/C

 

25Mn mild carbon steel annealing tubes

 

Contact Supplier

Ms. Judy Gao General Manager Chat Now
Telephone
0086-535-6835398
Mobile
86-18953537620
Fax
0086-535-6835383
Address
2th,Binglun Road,APEC Technology Industrial Park,Zhifu District,Yantai City Yantai,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~