Fuel oil and carbon black pyrolysis tyre with 100% no pollution
USD $43,000 - $49,500 /Set
Min.Order:1 Set
Xinxiang City Jinzhen Machinery Manufacturing Co., Ltd.
Working flow diagram:
◊Firstly, make reactor rotate clockwise 0.4r/min, put raw material into reactor, close feeding door.
◊ secondly, burned the fuel material(coal,or wood,or natural gas ,oil ) in the furnace. Reactor will be slowly heated, when the temperature reach around 180 oC, oil gas will come out .then go to cooling system and liquid to oil.
◊ thirdly, Some incondensable gas which can't cooling down will be lead to furnace through a gas pipe. It will be used to heat reactor.This can save your energy. Only the first 2 hours use energy for heating. After the first 2 hours mainly use gas, little energy is ok
◊ After pyrolysis, all the oil gas come out from reactor, the temperature will fall down. Then make it rotate anticlockwise, carbon black discharging begin.
◊ Lastly,when the temperature deduce to 80 oC, worker can open the door of reactor and take steel wire out.
♥ Main description of used plastic recycling pyrolysis
main parts of used plastic recycling pyrolysis
cooling system of used plastic recycling pyrolysis
carbon black slagging system of used plastic recycling pyrolysis
dedusting system of used plastic recycling pyrolysis
safety system of used plastic recycing pyrolysis
About us
Xinxiang Jin Zhen Machinery Manufacturing Co., Ltd mainly specialize some environmentallyfriendly renewable energy products which are scrap tire/rubber/plastic recycling machines and distillation oil equipments and tire cutting machines and so on.Nowadays, Jin Zhen has owned a good reputation both at home and abroad for its highly-qualified products and thoughtful service.
Equpiment Running in India:
In New Zealand
Advantage of scrap tyre recycling machines :
A. Safety.We treat safety as the first important thing in production.
1) Two devices to avoid backfire in production: oil-water separator and anti-back fire device.
2) Vacuum device makes reactor working under ordinary pressure or negative pressure.
3) Temperature monitoring device to avoid excessive working temperature.
4) Pressure gage to monitor the pressure. If it goes above a certain level, the bell will alarm and the safety valve will release the pressure automatically.
B. Environmental protection
1) The flue gas (caused by burning fuel to heat the reactor) will be purified and cooled by dust removal device, then can be released into air through chimney.
2) The procedure to remove carbon black is working under closed situation to avoid pollution.
C. High oil yield
1. We have 3 steps for cooling system: one condenser pipe, two large horizontal condensers and two vertical condensers. The oil gas pass through 3 steps cooling system in sequence. The total cooling area is 65 square meter.
2. When the oil gas pass through the condensers, it’s divided into several portions by small pipes inside condenser and be cooled separately.
3. In this way we maximize the cooling effect and improve the oil yield.
D. High oil quality
The oil gas is purified by molecular sieve inside catalyst chamber so that the quality of oil is higher.
E. Energy saving
1) The flame path is designed as spiral so that the quantity of heat can be fully used.
2) The residual gas from pyrolysis is recycled to furnace burning to heating the reactor.
F. High degree of automation
1) In manufacturing we use auto cutting machine, auto welding machine, auto rolling machine so that both quality and appearance of our products can be guaranteed.
2) In production, we use auto-feeder to feed raw materials into auto-feeder. By auto-feeder it needs few workers and less time to feed. And because of 50 ton hydraulic pressure from auto-feeder, it can feed more tires than labor.
3. In this way we maximize the cooling effect and improve the oil yield.
G. Long service life
1) The material of reactor is Q345R boiler plate with 16/18mm thickness which is produced by Chinese well-known enterprise. The head of reactor and accessories are using one-piece molding shell cover rather than welded plate.
2) All cutting, rolling and welding works are finished by automatic machines
Packaging & Shipping
1*40FR and 1*40HQ for 10 tons
2*40 HQ for 5 tons
Weight: about 30tons
All goods are packed with export standard package to make sure
no damage during transportation.
Our Services
1.Installation and Training: Our Company will send 1 technician for guiding your installation, testing the machine and training your workers. The installation period shall be 15-20 days. You shall pay salary for the technician with $100 per day and also the round-trip ticket and accommodation.
2. Warranty: 1). the reactor guarantee period shall be 12 months.
Worldwide Market:
Our Certification
Our company has passed the ISO9001:2008 and the ISO14001 2004, which marks the great progress it has made in the quality of the products and environmental protection.
Our customer
Our machines have been sold to many different countries, we are proud to be able to say that many of our customers have demonstrated their satisfaction with machines quality and our best service.