ASTM A519Grb Cold rolled seamless steel pipe
USD $600 - $1,000 /Metric Ton
Min.Order:5 Metric Tons
Yantai Xinpeng Steel Pipe Co., Ltd.
ASTM A519Grb Cold rolled seamless steel pipe
Introduction:
hydraulic cylinder tube st52 din2391 is a kind of after cold rolling processing of a kind of high precison steel tube, full name cold rolled precision seamless steel tube. Precision seamless steel tube wall inside and outside the precision seamless steel pipe seamless steel pipe without oxidation layars, under high pressure without lea, high precision, high finish, cold bending deformation, flaring, flattening without cracks,etc, it is mainly used to produce pneumatic or hydraulic components products, such as a cylinder or cylinder, are made seamless tube. the chemical composition of precision seamless steel tube with carbon sulfur C,Si, Mn, S, P, Cr.
Specification:
Standard | DIN2391, DIN2445, EN10305, GB/T 3639, GB 8713 |
Grade | ST35(E235), ST37, ST24(E255), ST52(E355), 10#, 20#, 35#, 45# |
O.D. | 4.0MM-400MM |
W.T. | 0.5MM-18MM |
Surface Treatment | bare, varnished,oiled, anti-corrosion coating as request |
Packing | 1. bundle packing 2. marking as per customer's requests 3. paint on the pipe as per customer request 4. pipe caps as customer request |
Condirion of Delivery | 1. NBK(+N) after cold forming, eventually above phase transition point, in a protective atmosphere of annealing oxidation medium 2. GBK(+A) after cold forming, annealing in non oxidizing medium protective gas 3. BK(+C) the final heat treatment after cold forming, threfore small steel pipe plasticly, the plasticly degree does not guarantee 4. BKW(+LC) after final heat treatment, a tiny cold drawing deformation, continue again when machining steel pipe allowed inside certain limits cold deformation(bending, flaring) 5. BKS(+SR) have a stress relief after cold forming, heat treatment, steel pipe can be carried out within a certain limit in the appropriate processing again |
3. The packaging process and other terms
Transportation: by sea
20' FCL (means the length than 5,800mm)
40' FCL (means the length than 11,800mm)
Bulk cargo (means the quantity is more than 200MT)
With regards to other length or quantity, it should be taken by clients themselves
Delivery time: 10-30days to the dispatch port after receipt of T/T or L/C at sight
Optional: wooden box; caps; vanished coating. Clients should pay for this fee
Payment: T/T or L/C at sight, T/T 100% in advance (the order less than 30MT)
Price item: FOB, CFR, CNF, C&F, CIF
Origin: China
Third party inspection: BV, SGS, Lloyds. The Expense needs to stand by clients.