Din2391 Ck45 Hydraulic cylinder honed seamless steel pipe
USD $600 - $1,000 /Metric Ton
Min.Order:5 Metric Tons
Yantai Xinpeng Steel Pipe Co., Ltd.
Steel grade: 20# 45# Q345 25Mn 27SiMn E355
Standard: GB/T8713 GB/T3639 DIN2391 EN10305 ASTMA519
ID range: 30-350mm
ID tolerance: H7 H8 H9
Curvature: 0.3
Wall thickness: 10%*ID
Final supply condition: BK/BKW/BKS/GBK/NBK
Trade terms: FOB Yantai, Qingdao or as client's request
Payment terms: T/T or L/C or as client's request
Delivery time: within 20-30 after receiving downpayment or as client's request
Located in Yantai, a beautiful coastal city in Jiaodong Peninsula, our company is in the (APEC) Science & Technology Industrial Park, urban area of Yantai, with convenient transportation.
Established in December 1992, with registered capital of 5 million yuan and plant and office space of 12,000 square meters, covering an area of 20,000 square meters , our company mainly produces various specifications of cold drawn,rolled precision steel tube,hydraulic cylinder tube and SRB Tube, which are widely used in such industries as hydro-cylinder, automobile, engineering machinery, textile machinery, printing machinery, oil drilling, etc. Our company is also the distributor of several domestic well-known steel tube plants in Shandong, and mainly distributes seamless steel tubes of all kinds of materials.
Mechanical Property
Delivery Condition | Cold drawn+stress-relieved(BK+S)(SR) | Cold finished(hard)(BK) | |||
Steel Grade | Tensile strength (Rm Mpa)
| Yield strength (ReH Mpa)
| Elongation A5% | Tensile strength (Rm Mpa)
| Elogation A5%
|
20# | ≥520 | ≥375 | ≥15 | ≥550 | ≥8 |
45# | ≥600 | ≥520 | ≥10 | ≥640 | ≥5 |
16Mn(Q345B Q345D) | ≥600 | ≥520 | ≥14 | ≥640 | ≥5 |
25Mn | ≥600 | ≥510 | ≥15 | ≥640 | ≥5 |
27SiMn | ≥760 | ≥610 | ≥10 | ≥800 | ≥5 |
St45 | ≥520 | ≥375 | ≥15 | ≥550 | ≥5 |
E355(St52) | ≥600 | ≥520 | ≥14 | ≥640 | ≥5 |
SAE1026 | ≥600 | ≥510 | ≥15 | ≥640 | ≥5 |
Process :
Delivery condition
1. NBK(+N)
after cold forming, eventually above phase transition point, in a protective atmosphere of annealing oxidation medium
2. GBK(+A)
after cold forming, annealing in non oxidizing medium protective gas
3. BK(+C)
the final heat treatment after cold forming, therefore small steel pipe plastically, the plastically degree does not guarantee
4. BKW(+LC)
after final heat treatment, a tiny cold drawing deformation, continue again when machining steel pipe allowed inside certain limits cold deformation(bending, flaring)
5. BKS(+SR)
have a stress relief after cold forming, heat treatment, steel pipe can be carried out within a certain limit in the appropriate processing
Packaging: standard packing with plastic bags or wooden cartons or as client's request
Shipping: arrange shippment within 20-30 days after receiving downpayment or as client's request
Q: What about your payment term?
A: Usually T/T or L/C or as client's request
Q: How about your capacity?
A: For steel pipes, 500 tons per month, 6000 tons per year.
Q: what about your package?
1. bundle packing
2. marking as per customer's requests
3. paint on the pipe as per customer request
4. pipe caps as customer requests
Q: If products have some quality problem,how would you deal with?
A: We will responsible for all of our quality problems and we are trade assurance supplier.