din 2391 pneumatic tubing
USD $600 - $1,100 /Metric Ton
Min.Order:5 Metric Tons
Yantai Xinpeng Steel Pipe Co., Ltd.
Benefits of pneumatic tubing :
Technique and Tolerance
Working Method | Range | Size of ID | Tolerance | |||||
ID tolerance | WT(mm) | Ovality | Curvature | |||||
H8 | H9 | H10 | ||||||
Cold Drawn | 25-250 | >30-50 | +0.0390 | +0.0620 | +0.1000 | ±5% to 7.5% ID>210mm ±10% | ≤0.10-0.20 | 0.3 |
Cold rolling | 25-150 | >50-80 | +0.0460 | +0.0740 | +0.1200 | |||
Cold drawn-hone | 40-250 | >80-120 | +0.0540 | +0.0870 | +0.1400 | |||
Cold drawn-SRB | 50-250 | >120-180 | +0.0630 | +0.1000 | +0.160 | |||
Cold drawn-polish | 40-250 | >180-250 | +0.0720 | +0.1150 | +0.1850 | |||
Cold drawn-polish-SRB | 50-250 | Other size and technique parameter upon request |
Process
Equipped with JLB250T hydraulic cold drawn set, LD120 cold rolling set, annealing furnace, strong honed machine, polishing machine, lathe, saws CNC skived and roller burnished machine, kinds of testing machine.
Company
Located in Yantai, a beautiful coastal city in Jiaodong Peninsula, our company is in the (APEC) Science & Technology Industrial Park, urban area of Yantai, with convenient transportation.
Established in December 1992, with registered capital of 5 million yuan and plant and office space of 12,000 square meters, covering an area of 20,000 square meters , our company mainly produces various specifications of cold drawn,rolled precision steel tube,hydraulic cylinder tube and SRB Tube, which are widely used in such industries as hydro-cylinder, automobile, engineering machinery, textile machinery, printing machinery, oil drilling, etc. Our company is also the distributor of several domestic well-known steel tube plants in Shandong, and mainly distributes seamless steel tubes of all kinds of materials.
Certification
Passing ISO 9001 System, our products are in tight tolerance and high quality control to meet every client's request.
Packaging
1.Standard packing with plastic caps and strapped bundles.
2.Commercial length 2000~10500mm,custom lengths upon request
3.Surface protection
4.Marking as client's request
5.Within 20-30 days after receiving downpayment or as client's request
FAQ
Q1.What do you want to purchase ?
What we can offer are cold drawn seamless tubes,cold drawn welded tubes (DOM tubes)
Q2.Do you have the target price ?
Generally ,we have the target price when we buy something ,which is good for both supplier and customer ,at the same time ,the target price should be objective ,reflecting the market.
Q3.What factors have an effect on the price ?
1 The market. our price rise and fall accompany with the market
2 The material and the grade .Different materials sometimes mean hundreds dollars.
3 The sizes. generally ,the thinner is more expensive because of the manufacture difficulty
If you are interested in our products, pls without hesitation to contact us!