ISO certification cold finished steel pipe
USD $600 - $1,250 /Metric Ton
Min.Order:5 Metric Tons
Yantai Xinpeng Steel Pipe Co., Ltd.
Product name: ISO cerfitication cold finished steel pipe
1.Raw material:20#.45#,Q345,16Mn,25Mn,27SiMn
2.ID:30-250mm
3.ID tolerance:H7,H8,H9 or as customized
4. Final supply condition: BK/BKW/BKS/GBK/NBK
5. Machining allowance:0.5-1.5mm
6.Length: Max 11M
Our main products
1 Hydraulic Cylinder Tube
Used in the hydraulic cylinder of the heavy machinery, Cranes, excavator also forklifts. We can work and get the mechanical property of the clients need.
2. SRB tube
Directly used in Elevatorbuffer and Hydraulic Cylinder .This kind tube have a better inner roughness , ra0.2-0.4um and can use directly in the hydraulic cylinder tube. Length can work at most 6M.
3. Cold finished tube
Widely Used. Processing range 30-300mm, biggest length is 11M.
Technique and tolerance
Working Method | Range | Size of ID | Tolerance | |||||
ID tolerance | WT(mm) | Ovality | Curvature | |||||
H8 | H9 | H10 | ||||||
Cold Drawn | 25-250 | >30-50 | +0.0390 | +0.0620 | +0.1000 | ±5% to 7.5% ID>210mm ±10% | ≤0.10-0.20 | 0.3 |
Cold rolling | 25-150 | >50-80 | +0.0460 | +0.0740 | +0.1200 | |||
Cold drawn-hone | 40-250 | >80-120 | +0.0540 | +0.0870 | +0.1400 | |||
Cold drawn-SRB | 50-250 | >120-180 | +0.0630 | +0.1000 | +0.160 | |||
Cold drawn-polish | 40-250 | >180-250 | +0.0720 | +0.1150 | +0.1850 | |||
Cold drawn-polish-SRB | 50-250 | Other size and technique parameter upon request |
Process
Equipped with JLB250T hydraulic cold drawn set, LD120 cold rolling set, annealing furnace, strong honed machine, polishing machine, lathe, saws CNC skived and roller burnished machine, kinds of testing machine.
Services
1.passing ISO9001 system verified and in high quality control
2.with more than 20 years trading experience
3.offering superior quality and competitive price
4.treating every client sincerely to satisfy them
FAQ
Q: what about your standard delivery date?
A: 30 days after receiving deposit
Q: How about your capacity?
A: For steel pipes, 500 tons per month, 6000 tons per year.
Q: what about your package
1. bundle packing
2. marking as per customer's requests
3. paint on the pipe as per customer request
4. pipe caps as customer reques
Q: What is your main market &main customers
A: We have 23years experience on steel pipes .Our main market includes China, Korea, Pakistan etc.
Q: If products have some quality problem,how would you deal with?
A: We will responsible for all of our quality problems and we are trade assurance supplier.
More products details pls contact us!