hot selling polyethelene geotextile fabric for swimming pool
USD $5 - $6 /Square Meter
Min.Order:2000 Square Meters
Landy (Guangzhou) Plastic Products Co., Ltd.
hot selling polyethelene geotextile fabric for swimming pool
Specification:
Material | PP, PET fabric |
Normal Weight | 200g/m2-800g/m2 |
Color | White,Black,grey and other colors |
width of a roll | 1m-6m |
Length of a roll | 50m-100m as request |
Packing | Poly bags |
Production time | 10 working days |
large strength, stable size, good filtrability etc.
3. Excellent drainage performance.
4.High strength,excellent tenacity.
5. Anti-aging,anti-acid and alkali.
6. Can accommodate irregular deformations.
7. Creep, corrosion and abrasion resistance.
8. Safe and easy for construction.
9. Authorized certificates.
10. ISO and SGS Certificates.
Product Parameter:
Geotextile Applications:
At the same time of preventing the clay granule from passing, it allows the water and
the gas pass through freely.
2) Separation :
The isolation of the railway dregs and the roadbed, roadbed and the soft base, surface of the
airdrome and parking lot and the groundsill, different dam materials.
It isolates the soil and the gravel of two kinds different granule pathway
from the groundsill or other buildings.
3) Adding muscle :
The highway, railway, soilstone dam, breakwater, airport, backfill soil of retaining wall,
slope protection, etc in which distributes the earth stress, prevents the side-
displacement of the earth body and improves the earth body stability.
4) Protection :
It prevents the bank from being washed out, protects the bank and the bottom,
prevents the water and soil from being washed away.
5) Widely used in highway, railway, dam, coastal shoal engineering reinforcement,
inverted filter,
isolation and drainage,useful the floor of the Swimming pool.
How to Order?
Don’t hesitate to contact us; our friendly and skilled sales team will be more than happy to
answer your questions.
Note:
T/T 30% deposit and 70% balance before delivery or Irrevocable LC at sight
Production time: 7-15 days after receiving the deposit.