HeNan hot sale new steel metal materiasl structural cheap workshop
USD $20 - $35 /Square Meter
Min.Order:200 Square Meters
Henan Province Canglong Steel Structure Engineering Co., Ltd.
NOW our company have favoured policy for steel workshop . it is 5% discount if you have workshop to order in this month , because we have large stock on steel plate !!! so come here , come here .........
Bellow materials are general used in steel buildings , but we often customized each type depend on clients requirment .
Projects name : HeNan hot sale new steel metal materiasl structural cheap workshop
Item Name | Materials Characteristics | Material Grade | Surface Treatment |
Steel Column | H shape,Box,Steel Pipe,Hot tolled sheet | Q235B,Q345B | Paint or Hot dip Galvanized |
Steel beam | H shape,Box,Steel Pipe,Hot tolled sheet | Q235B,Q345B | Paint or Hot dip Galvanized |
Steel Bracing | Steel Rod,Steel Pipe,Angle Steel | Q235B,Q345B | Paint or Hot dip Galvanized |
Steel Purlin | C or Z purlins(Thickness1.8mm~3.0mm) | Q235B,Q345B | Hot dip Galvanized |
External Wall panels,Roof panels | Single colorful corrugate steel sheet,sandwich panels with EPS,Rock wool,PU. | Galvanized Steel+Painting | Alu-zin 150g,Fluorocarbon pain |
Steel buildings Door | Slidding or Rolling door | Steel or Aluminum sheet | Paint or Hot dip galvanized |
Steel buildings Windows | Aluminum alloy-Glass,Aluminum alloy-shutter | T=1.0-2.0mm | Alloy |
Skylighting panels | FRP T=1.5mm-1.8mm | Coefficient of thermal expansion:2.2x10-5/cm | Light Tranmitar 85% |
Ventilator | Turbine ventilator on a ridge | Steel,Stainless steel ,PC | Paint or Hot dip Galvanized |
Gutter | Galvanized steel plate,Stainless steel plate | T=2.0mm | Hot dip galvanized |
Downpipe | PVC pipe,color steelpipe Y=0.5mm | Dia110mm | paint |
Hight Bolt | Ordinary ,High strength | 10.9S,4.8S | Hot dip galvanized,Steel |
Ground bolts | Steel RodM24,M27,M30,M33,M39,M42 | 10.9S | Steel |
1. Strictly control the welding position of the relative position of size , welding pass behind the prospective;
2. Reasonablly selection of welding parameters and order to prevent crack;
3. Electrode required drying, welding area need to clean up, welding process, together with the appropriate welding current, decrease of welding speed, gas completely escape , prevent the formation of weld porosity;
4. When continuously multi-layer welding, each weld layer after cleaning, prevent the formation of slag;
5. Selection for current, avoid arc pull too long, control electrode angle and arc method, avoid the generation of undercut.
Attached: welding process parameters
welding process parameters
Materals(mm) | Electrode diameter (mm) | Welding current(A) | Welding voltage(V) | Welding speed(m/min) |
<10 | Ø3.2 | 200-250 | 30-38 | 0.2-0.3 |
10-20 | Ø4.0 | 200-250 | 30-38 | 0.15-0.25 |
>30 | Ø4.0 | 320-350 | 30-38 | 0.3-0.5 |
All steel structure warehouse,workshop ,storage ,steel prefabricated house , prefab home,prefab villas ,Steel Beams and Pillars connecteed Detail:
Steel Beams and Brace connected Detail:
Foundation Steel Ground bolts Detail :
We use Ultrasonic detector ,X-ray detector , Paint film thickness gauge to check .
1.Steel structure welding requirements
Engaged in welding of steel structure work welders must pass the examination and obtain a certificate. The holder welder must welding in its passing the examination and approval within the scope of the project.
2.Fastener connection requirements
Steel structure fabrication and installation of units should be in accordance with the provisions of the high strength bolts respectively connected with friction surface of the anti slip coefficient test and retest, component friction surface site should be dealt with separately anti slip coefficient test, the results should be consistent with design requirements.
3.Steel structure assembly and installation of steel structure requirements
(1) of H type steel welding seam splicing spacing and the web of the seam shall not be less than 200 mm.
(2) and crane beam crane truss installation in place should not be deflection.
(3) multi section column installation, each column positioning ground control axis should lead directly, not from the axis of lower column guide, avoid too large error accumulation.
(4) the steel grid structure after the completion of the total spell and roofing project should be finished respectively to measure the deflection, the deflection and the measured value of 1.15 times can't exceed the design value.
(5) coating, coating times, coating thickness shall comply with the design requirements.
(6) the thickness of coating coated thin type fireproof coating shall conform to the requirements of design about the fireproof limit.
4.Electric single girder crane technical parameters
LD - type A electric single girder bridge crane and CD1, MD1 type electric hoist necessary use, become a light rail running a small crane.
This product is a general purpose crane, for mechanical manufacturing, assembly workshop and warehouse and other places.
As with Motor Grab spreader, is handling and transportation of bulk goods. This product is suitable for lifting weight 1, 2, 3, 5, 10 tons, 22.5 meters span 7.5-.
The crane control mode with the ground (divided into wired and wireless two), control room control, for users to select.
This product is not flammable, explosive in the medium or large humidity with acid, alkali gases places of work, is not suitable for lifting and transporting molten metal, toxic and flammable work.
This product series is a series of products of electric single girder crane adopts the international advanced standard manufacturing. The machine has the advantages of novel structure, good technology, operation is flexible and stable, safe and reliable.
1. Common type of the industrial steel structure building/Prefabricated house?
Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request.
2. What’s the quality grade of the steel structure components?
Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure.
3. How about the delivery time?
Reply: Usually,within 20-25 days after the order confirmed, also depends on the order quantity.
4. How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure;
manual derust St2.0 on secondary steel structure.
5. What is kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU sandwich panels.
6. How to install it?
Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if need. if you have no workteams , we can send our professtional teams to install for you.
7. Maintenance:
Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.
8. Prefabricated warehosue/workshop/Prefab house/Storage Life :
Reply : All steel structure frame life is more than 50 Years , all caldding sheets are about 20 Years .
Welcome you to send inquiry to our company NOW ,we would like to supply best service for you !
Contact : Ada Gao Whatsapp/Viber/wechat: +86 15981850388