Alibaba China supplier steel structure low cost warehouse
Alibaba China supplier steel structure low cost warehouse
Alibaba China supplier steel structure low cost warehouse
Alibaba China supplier steel structure low cost warehouse
Alibaba China supplier steel structure low cost warehouse
Alibaba China supplier steel structure low cost warehouse

Alibaba China supplier steel structure low cost warehouse

USD $25 - $35 /Square Meter

Min.Order:100 Square Meters

Supply Ability:
3000 Ton / Tons per Month
Port:
QingDao port
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Place of Origin:
Henan, China
Brand Name:
CangLong
Model Number:
Steel Frame Warehouse

Henan Province Canglong Steel Structure Engineering Co., Ltd.

Business Type: Trading Company
Zhengzhou Henan China
Main Products: steel structure warehouse ,steel structure workshop ,C/ Z purlin/H steel ,cold storage ,prefabricated house/home

Product Details

Alibaba China supplier steel structure low cost warehouse

Company Information

Who Are We ?

  Thank you for your interest in Henan CangLong Steel Structures co,.ltd ,  We are a family owned business and have been in operation since 2007, who is specializing in post frame steel buildings. Our individually engineered permanent structures are the best choice for customers requiring speed of construction and economy coupled with aesthetic value. Our buildings are ideal for residential, commercial , agricultural ,industrial and chemical factories ,warehouses & stores , hospitals & clinics,multi-storey buildings , supermarkets ..

Why is CangLong Steel Structures the Right Choice?

  Your investment is an important decision and should be realized through a financially stable company.  Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.

The Edge

 Competitive Prices Our production capacity (approximately 20000 metric tons annually) together with effective

 and economic 

 engineering and manufacturing methods enable us to offer the most competitive prices in the industry.

Fast Quotations

 Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced 

software we use.

Fast Delivery 

 (1)We are able to design, detail, fabricate and supply simple buildings in approximately 4 weeks. 
 (2)Most of our buildings are delivered and erected within 8 weeks (this relies on various factors such as stock 

position, weather etc).
Site Supervision 

  (1)A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
  (2)Any problems that arise are quickly dealt with to minimise any delays. 
  (3)Safety on site is also made a priority.


 

Production Flow

Alibaba China supplier steel structure low cost warehouse 

 

Materials department

"Steel Design Code" (GB50017-2003)

 "Cold-formed steel structure technical specifications" (GB50018-2002)

 "Construction Quality Acceptance of Steel" (GB50205-2001)

 "Technical Specification for welded steel structure" (JGJ81-2002, J218-2002)

 "Technical Specification for Steel Structures of Tall Buildings" (JGJ99-9)

Alibaba China supplier steel structure low cost warehouse 

 

Detecting instrument

We often use Ultrasonic detector ,X-ray detector , Paint film thickness gauge to check steel frame .

Alibaba China supplier steel structure low cost warehouseAlibaba China supplier steel structure low cost warehouse

Alibaba China supplier steel structure low cost warehouseAlibaba China supplier steel structure low cost warehouse

       

 

Related Products

Alibaba China supplier steel structure low cost warehouse 

 

 

Packaging & Shipping

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

Alibaba China supplier steel structure low cost warehouse 

 

FAQ

1. Common type of the industrial building?

Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request.

2. What’s the quality grade of the steel structure components?

Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. 
3. 
How about the delivery time?
Reply: Usually,within 25-30 days after the order confirmed, also depends on the fabrication quantity.
4. 
How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure; 
manual derust St2.0 on secondary steel structure.
5. 
What is kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU.
6. 
How to install it?

Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if neede

7. Maintenance:

Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.

Customers Visit

Alibaba China supplier steel structure low cost warehouseAlibaba China supplier steel structure low cost warehouse 

 

 

 

 

 

 

Contact Supplier

Ms. Ada Gao General Manager Chat Now
Telephone
86-0371-55888285
Mobile
15981850388
Fax
86-0371-55888285
Address
Go ahead east 500 meters from 107 National RdXinZheng crossing Zhengzhou City.Henan China Zhengzhou,Henan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Real Estate > Warehouses
Categories
Hi~