steel fabrication frame
steel fabrication frame
steel fabrication frame
steel fabrication frame
steel fabrication frame
steel fabrication frame

steel fabrication frame

USD $20 - $30 /Square Meter

Min.Order:200 Square Meters

Supply Ability:
3500 Ton / Tons per Month
Port:
QingDao/Tianjin
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Standard:
AISI, ASTM, BS, DIN, GB, JIS
Grade:
Q345B Q235B
Dimensions:
H beams ,C profiles ,steel bar
Place of Origin:
Henan, China
Brand Name:
CANGLONG
Model Number:
0519

Henan Province Canglong Steel Structure Engineering Co., Ltd.

Business Type: Trading Company
Zhengzhou Henan China
Main Products: steel structure warehouse ,steel structure workshop ,C/ Z purlin/H steel ,cold storage ,prefabricated house/home

Product Details

Steel fabrication frame 

Company Information

Who Are We ?

  Thank you for your interest in Henan CangLong Steel Structures co,.ltd ,  We are a family owned business and have been in operation since 2007, who is specializing in post frame steel buildings. Our individually engineered permanent structures are the best choice for customers requiring speed of construction and economy coupled with aesthetic value. Our buildings are ideal for residential, commercial , agricultural ,industrial and chemical factories ,warehouses & stores , hospitals & clinics,multi-storey buildings , supermarkets ..

Why is CangLong Steel Structures the Right Choice?

  Your investment is an important decision and should be realized through a financially stable company.  Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.

The Edge

 Competitive Prices Our production capacity (approximately 20000 metric tons annually) together with effective

 and economic 

 engineering and manufacturing methods enable us to offer the most competitive prices in the industry.

Fast Quotations

 Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced 

software we use.

Fast Delivery 

 (1)We are able to design, detail, fabricate and supply simple buildings in approximately 4 weeks. 
 (2)Most of our buildings are delivered and erected within 8 weeks (this relies on various factors such as stock 

position, weather etc).
Site Supervision 

  (1)A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
  (2)Any problems that arise are quickly dealt with to minimise any delays. 
  (3)Safety on site is also made a priority.

Production Flow

steel fabrication frame

 

Pay attention

1. Strictly control the welding position of the relative position of size , welding pass behind the prospective;

2. Reasonablly selection of welding parameters and order to prevent crack;

3. Electrode required drying, welding area need to clean up, welding process, together with the appropriate welding current, decrease of welding speed, gas completely escape , prevent the formation of weld porosity;

4. When continuously multi-layer welding, each weld layer after cleaning, prevent the formation of slag;

5. Selection for current, avoid arc pull too long, control electrode angle and arc method, avoid the generation of undercut.

Attached: welding process parameters

welding process parameters

Materals(mm)

Electrode diameter  (mm)

Welding current(A)

Welding voltage(V)

Welding speed(m/min)

<10

Ø3.2

200-250

30-38

0.2-0.3

10-20

Ø4.0

200-250

30-38

0.15-0.25

>30

Ø4.0

320-350

30-38

0.3-0.5

Detecting instrument

We often use Ultrasonic detector ,X-ray detector , Paint film thickness gauge to check steel frame .

steel fabrication framesteel fabrication frame

steel fabrication framesteel fabrication frame

Packaging & Shipping

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

steel fabrication frame 

Installation Notice

1.Steel structure welding requirements

Engaged in welding of steel structure work welders must pass the examination and obtain a certificate. The holder welder must welding in its passing the examination and approval within the scope of the project.

2.Fastener connection requirements

Steel structure fabrication and installation of units should be in accordance with the provisions of the high strength bolts respectively connected with friction surface of the anti slip coefficient test and retest, component friction surface site should be dealt with separately anti slip coefficient test, the results should be consistent with design requirements.

3.Steel structure assembly and installation of steel structure requirements

(1) of H type steel welding seam splicing spacing and the web of the seam shall not be less than 200 mm.

(2) and crane beam crane truss installation in place should not be deflection.

(3) multi section column installation, each column positioning ground control axis should lead directly, not from the axis of lower column guide, avoid too large error accumulation.

(4) the steel grid structure after the completion of the total spell and roofing project should be finished respectively to measure the deflection, the deflection and the measured value of 1.15 times can't exceed the design value.

(5) coating, coating times, coating thickness shall comply with the design requirements.

(6) the thickness of coating coated thin type fireproof coating shall conform to the requirements of design about the fireproof limit.

4.Electric single girder crane technical parameters

LD - type A electric single girder bridge crane and CD1, MD1 type electric hoist necessary use, become a light rail running a small crane.

This product is a general purpose crane, for mechanical manufacturing, assembly workshop and warehouse and other places.

As with Motor Grab spreader, is handling and transportation of bulk goods. This product is suitable for lifting weight 1, 2, 3, 5, 10 tons, 22.5 meters span 7.5-.

The crane control mode with the ground (divided into wired and wireless two), control room control, for users to select.

This product is not flammable, explosive in the medium or large humidity with acid, alkali gases places of work, is not suitable for lifting and transporting molten metal, toxic and flammable work.

This product series is a series of products of electric single girder crane adopts the international advanced standard manufacturing. The machine has the advantages of novel structure, good technology, operation is flexible and stable, safe and reliable.

steel fabrication frame

 

Connected Detail

Steel Beams and Pillars connecteed Detail:

steel fabrication frameSteel Beams and Brace connected Detail:

steel fabrication frame

Foundation Steel Ground bolts Detail :

steel fabrication framesteel fabrication frame 

FAQ

1. Common type of the industrial building?

Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request.

2. What’s the quality grade of the steel structure components?

Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. 
3. 
How about the delivery time?
Reply: Usually,within 25-30 days after the order confirmed, also depends on the fabrication quantity.
4. 
How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure; 
manual derust St2.0 on secondary steel structure.
5. 
What is kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU.
6. 
How to install it?

Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if neede

7. Maintenance:

Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.

   Welcome you to ask our company questions and we would like to supply best service for you !

   Contact ways : Ada Gao (Female) , Tel/Whatsapp/Viber: +86 15981850388

 

 

 

Contact Supplier

Ms. Ada Gao General Manager Chat Now
Telephone
86-0371-55888285
Mobile
15981850388
Fax
86-0371-55888285
Address
Go ahead east 500 meters from 107 National RdXinZheng crossing Zhengzhou City.Henan China Zhengzhou,Henan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Structures
Categories
Hi~