forming c steel purlin for steel fabrication
forming c steel purlin for steel fabrication
forming c steel purlin for steel fabrication
forming c steel purlin for steel fabrication
forming c steel purlin for steel fabrication
forming c steel purlin for steel fabrication

forming c steel purlin for steel fabrication

USD $450 - $500 /Ton

Min.Order:20 Tons

Supply Ability:
5000 Ton / Tons per Month
Port:
Qingdao/TianJin
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Place of Origin:
Henan, China
Brand Name:
canglong
Model Number:
Q235,Q345
Material:
Steel

Henan Province Canglong Steel Structure Engineering Co., Ltd.

Business Type: Trading Company
Zhengzhou Henan China
Main Products: steel structure warehouse ,steel structure workshop ,C/ Z purlin/H steel ,cold storage ,prefabricated house/home

Product Details

light weight c steel purlin

Company Information

Who Are We ?

  Thank you for your interest in Henan CangLong Steel Structures co,.ltd ,  We are a family owned business and have been in operation since 2007, who is specializing in post frame steel buildings. Our individually engineered permanent structures are the best choice for customers requiring speed of construction and economy coupled with aesthetic value. Our buildings are ideal for residential, commercial , agricultural ,industrial and chemical factories ,warehouses & stores , hospitals & clinics,multi-storey buildings , supermarkets ..

Why is CangLong Steel Structures the Right Choice?

  Your investment is an important decision and should be realized through a financially stable company.  Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.

The Edge

 Competitive Prices Our production capacity (approximately 20000 metric tons annually) together with effective

 and economic 

 engineering and manufacturing methods enable us to offer the most competitive prices in the industry.

Fast Quotations

 Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced 

software we use.

Fast Delivery 

 (1)We are able to design, detail, fabricate and supply simple buildings in approximately 4 weeks. 
 (2)Most of our buildings are delivered and erected within 8 weeks (this relies on various factors such as stock 

position, weather etc).
Site Supervision 

  (1)A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
  (2)Any problems that arise are quickly dealt with to minimise any delays. 
  (3)Safety on site is also made a priority.


Our company workshop

forming c steel purlin for steel fabrication 

Pay attention

1. Strictly control the welding position of the relative position of size , welding pass behind the prospective;

2. Reasonablly selection of welding parameters and order to prevent crack;

3. Electrode required drying, welding area need to clean up, welding process, together with the appropriate welding current, decrease of welding speed, gas completely escape , prevent the formation of weld porosity;

4. When continuously multi-layer welding, each weld layer after cleaning, prevent the formation of slag;

5. Selection for current, avoid arc pull too long, control electrode angle and arc method, avoid the generation of undercut.

Attached: welding process parameters

welding process parameters

Materals(mm)

Electrode diameter  (mm)

Welding current(A)

Welding voltage(V)

Welding speed(m/min)

<10

Ø3.2

200-250

30-38

0.2-0.3

10-20

Ø4.0

200-250

30-38

0.15-0.25

>30

Ø4.0

320-350

30-38

0.3-0.5

forming c steel purlin for steel fabrication

Size

Theoretical

weight (kg/m)

size

Theoretica
l weight (kg/m)

size

Theoretica
l weight (kg/m)

100*50*5*7

9.54

294*302*12*12

85

482*300*11*15

115

100*100*6*8

17.2

300*300*10*15

94.5

488*300*11*18

129

125*60*6*8

13.3

300*305*15*15

106

496*199*9*14

79.5

125*125*6.5*9

23.8

338*351*13*13

106

500*200*10*16

89.6

148*100*6*9

21.4

340*250*9*14

79.7

582*300*12*17

137

150*75*5*7

14.3

344*354*16*16

131

588*300*12*20

151

150*150*7*10

31.9

346*174*6*9

41.8

596*199*10*15

95.1

175*90*5*8

18.2

350*175*7*11

50

600*200*11*17

106

175*175*7.5*11

40.3

344*348*10*16

115

700*300*13*24

185

194*150*6*9

31.2

350*350*12*19

137

 

 

198*99*4.5*7

18.5

388*402*15*15

141

 

 

200*100*5.5*8

21.7

390*300*10*16

107

 

 

200*200*8*12

50.5

394*398*11*18

147

 

 

200*204*12*12

72.28

400*150*8*13

55.8

 

 

244*175*7*11

44.1

396*199*7*11

56.7

 

 

244*252*11*11

64.4

400*200*8*13

66

 

 

248*124*5*8

25.8

400*400*13*21

172

 

 

250*125*6*9

29.7

400*408*21*21

197

 

 

250*250*9*14

72.4

414*405*18*28

233

 

 

250*255*14*14

82.2

440*300*11*18

124

 

 

294*200*8*12

57.3

446*199*7*11

66.7

 

 

300*150*6.5*9

37.3

450*200*9-14

76.5

 

 

Packaging & Shipping

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

forming c steel purlin for steel fabrication 

Customers Visit

forming c steel purlin for steel fabricationforming c steel purlin for steel fabrication 

Buying Guides

1.Dimension :Length , width, height, eave height , roof pitch .

2.Doors and windows :dimension , quantity , where to put them.

3.Local climate : Wind speed , snow load ,etc

4.insulation material :sandwich panel or steel sheet

5.Crane beam :Do you need crane beam &tons? inside the steel structure or outside ?

6.Is there any materials that are not allowed to imported into the country where the structure is planning to use ?

7.What is the founctions of the workshop? we must consider the wind and lighting inside.

8.Pls send us your drawings if you have ready plan .

    Welcome you ask our company questions and we would like to supply best service for you !

   Contact ways : Ada Gao (Female) , Tel/Whatsapp/Viber: +86 15981850388

Contact Supplier

Ms. Ada Gao General Manager Chat Now
Telephone
86-0371-55888285
Mobile
15981850388
Fax
86-0371-55888285
Address
Go ahead east 500 meters from 107 National RdXinZheng crossing Zhengzhou City.Henan China Zhengzhou,Henan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Metal Building Materials
Categories
Hi~