China top selling high quality 304 seamless manufacturer stainless steel pipe price
USD $1,100 - $2,100 /Ton
Min.Order:1 Ton
Foshan Shunde Pemco Hardware Co., Ltd.
Item No. | PJ-E001 |
Material | Stainless Steel 201/304/316 |
Material Grade | 201(Ni 0.8%--1%) |
304(Ni 7.5%--8%) | |
316(Ni 16%--18.5%) | |
Thickness | 0.8-2 mm |
Shape | Round / Square / Rectangular / Oval Etc. |
Surface Finishes | Satin/Hairline/Mirror Finish |
Outer Diameter | 9.5mm--∞ |
Length | 5.8mm—6m Or As Customer’s Request |
Application | Industrial / Decorative Etc. |
Test | Squash Test / Extended Test / Water Pressure Test / Crystal Rot Test / Heat Treatment / NDT |
Material | C | Si | Mn | P | S | Cr | Ni |
SS 201 | ≤0.12 | ≤0.75 | 9.5-12.5 | ≤0.045 | ≤0.03 | 13-16 | 0.8-1.5 |
SS 304 | ≤0.08 | ≤0.75 | ≤2.0 | ≤0.045 | ≤0.03 | 18-19 | 8-10 |
SS 316 | ≤0.08 | ≤1.00 | ≤2.0 | ≤0.035 | ≤0.03 | 10-14 | 16.0-18.5 |
Foshan Shunde Pemco Hardware Co., Ltd
Is a group corporation of 3 plants and a company for export, aiming to provide high quality stainless steel pipe and fittings. In1997,we decided to enter this field and soon the SS rail fitting factory was born.To cater for different needs of markets,we set up a SS 201 pipe factory in 2000 and a company to handle the exportation in 2003. Thanks to the support of customers, we have been able to extend our product range and open up a SS 304 pipe factory in 2013,with a productivity of 5000 ton per month. Our mottor is to be the forerunner of the stainless steel industry. Our products could not only meet the ISO production standard, but also SGS ASTM A276-13 & ASTM E1086-14. More than ten years experience has etched in us a comprehensive understanding of the customer's needs. The satisfaction of customer is the driving force of our development.
Q1.Where is your factory?
We have two factories. One is for ss pipes in Foshan City,another is for handrail fittings in Chaozhou City.
Q2.What material do you have?
SS304/SS201/SS316
Q3.Can you provide sample for us?
Yes, free sample is available
Q4. Can you do the full set of handrails for us?
yes we can, our engineer will check your project drawings to make sure its accuracy for each different fittings and quantity.
Q5. How about your delivery time ?
15-20 days for Pipe. 25-30 days for handrail fittings .