Economic LED tunnel Lights for underground car parking
Negotiable /Piece
Min.Order:3 Pieces
Guangdong Delos Lighting Industrial Co., Ltd.
1) Key Features of LED Tunnel Light (DL0606):
1) Simple and elegant appearance;
2) Seperate light source and power supply for easy installation and maintenance;
3) Three section configuration for flexible power;
4) Design theory of 23K temperature raise;
5) Unique optical systerm conforming to tunnel lighting standarts;
6) Superior tempered glass diffuser ensure high ligh transmission and invariant color;
7) Long life power driver ensures above 50000 hours use-life and has short ,open-circuit and over-heat protection.
2) Specification of Led Industrial Light :
Item No. | DL0606 | DL0606A | DL0606B | DL0606C | DL0606D | DL0606E | DL0606F | DL0606G |
Input Voltage | AC85-265V | AC85-265V | AC85-265V | AC85-265V | AC85-265V | AC85-265V | AC85-265V | AC85-265V |
Frequency | 47-63Hz | 47-63Hz | 47-63Hz | 47-63Hz | 47-63Hz | 47-63Hz | 47-63Hz | 47-63Hz |
Power Factor | >0.95 | >0.95 | >0.95 | >0.95 | >0.95 | >0.95 | >0.95 | >0.95 |
THD | <15% | <15% | <15% | <15% | <15% | <15% | <15% | <15% |
Light Source | CREE 36*1W | CREE 48*1W | CREE 60*1W | CREE 24*1.5W | CREE 36*1.5W | CREE 48*1.5W | CREE 24*2W | CREE 36*2W |
Led Power | 36W | 48W | 60W | 36W | 54W | 72W | 48W | 72W |
System Consumption | 41W | 52W | 68W | 41W | 61W | 81W | 54W | 81W |
Luminous Efficiency | >100lm/W | >100lm/W | >100lm/W | >95lm/W | >95lm/W | >95lm/W | >80lm/W | >80lm/W |
Initial Luminous Flux | >3600lm | >4800lm | >6000lm | >3420lm | >5130lm | >6840lm | >3840lm | >5760lm |
Constant Luminous Flux | >3240lm | >4320lm | >5400lm | >3078lm | >4617lm | >6156lm | >3456lm | >5184lm |
Luminaire Efficiency | >80% | >80% | >80% | >80% | >80% | >80% | >80% | >80% |
System Rresistance | 0.61°C/W | 0.46°C/W | 0.37°C/W | 0.64°C/W | 0.43°C/W | 0.32°C/W | 0.52°C/W | 0.35°C/W |
Light distribution curve:
3) Photos of Led tunnel light (DL0606):
Dimension:L:326mm/464mm/602mm/740mm; W:246.5mm; H:121mm.
4) Project of Led tunnel light (DL0606):
5) Trad Term:
Payment: T/T 30% in advance,balance before delivery;
Sample time:10days.