die manufacturer in plastic extrusion laminating die/mould
USD $1 - $2,500 /Piece
Min.Order:1 Piece
Taizhou Huangyan Jingwei Mould Co., Ltd.
Shipping & Packing: domestic free shipping, composite boards wooden packaging.
Quality assurance: meet the actual requirements, three packs of one year of normal production quality.
Mold Use: suitable for the production of 1-45mm thick plate, apply: PP, PVC, PE, PS, PC, ABS, PMMA and other raw materials!
Jing Wei is a professional mold flat die extrusion supplier, advanced processing equipment and senior technicians talent; good price and high quality products and services to every customer.
problem | reason | solve problem |
1. Uneven thickness of sheet | 1.the temperature is not settled reasonability | (1)The temperature affects the melted plastic’s flow form in the mould runner, and also affect the plastic product’s thickness, The workers should cheek whether the heating device is damaged or not, and every section’s temperature is reasonable or not. Please tiny turn down or turn up the temperature according to the production status, in order to stabilize the mould temperature. |
2.wire connection mistake or temperature measuring device damagement | (2)Please cheek the actual temperature is coincidental with the initialized temperature or not, the temperature measuring device (thermocouple) should stick into the bottom, and be connected to the mould by the screw. Any of the heating devices that is not working well should be changed. | |
Pressure fluctuations | (3)Please check Gear Pump,screen changer and feedblock.and adjust die lip after extrusion stable | |
Non-uniform of sheet’s horizontal thickness | (4)Please adjust die lip by mirco adjustable screw | |
Dusty in lip | (5)Please clean the die lip | |
Any problem of runner caused by die’s deformation | (6)Please give it to manufacture. | |
Sheet’s surface defect | There is too much impurities in the melt. | (1)to re-clean-up mould and connectors
|
too much impurities in the runner | (2)due to equipment long-term operation, the melt or impurities will accumulate in the runner , affect the melt flow as well as product quality, runner should be cleaned up periodically, In normal operation we suggest clean up the runner every month thus prolonging the life of mould | |
runner or mould lip parts are scratch | (3) If can’t fix it by yourself, please contact the manufacturer | |
the runner chromium plating layer off. | (4)after the long-term operation or use corrosive materials may cause chromium plating layer off | |
leakage | the pressure of entrance side over the machine limit. | (1) Check extruder settings, Have damaged or stress test error pressure sensor need to be replaced or make recalibration |
the junction part screws didn’t tighten | (2) heating it and re-tighten the screws, Should use uniform torque | |
the surface of mounting surface is irregularity. | (3) to re-clean the surface, if it is necessary, planish with the millstone | |
Assembly is not in place or sealer damage. | (4) Check the installation location of parts, tighten the screws evenly, or replace a new sealer |
Laminating die Standard width: 1100mm-500mm adjustable. 1300mm-600mm adjustable. 1500mm-800 can be adjusted. 1700mm-1000mm adjustable. 2000mm-1200mm can be adjusted. 2500mm-1800mm can be adjusted.
· With the blocking devices to eliminate thick edge function
· Thickness range :0.005-0 .1 m arbitrary regulation
· Coating die heating: stainless steel heating rods cast outside the district heating or district heating plate
· Push the whole lip trimming structure
· Products accuracy to within ± 2%
1. Packaging Detail:
Outside package: Standard export wooden cases;
Inner package: Bubble wrap.
2. Delivery Detail:
Die length< 2000mm : within 30 days, 2000mm<Die length<3000mm, within 45 days.
Jing Wei is a professional mold flat die extrusion supplier, advanced processing equipment and senior technicians talent; good price and high quality products and services to every customer
In the exhibition
Welcome to your negotiate.