Prefab Metal structure Steel Construction hotel Building
USD $69 - $99 /Square Meter
Min.Order:1 Square Meter
Foshan Yayuan Metal Products Co., Ltd.
Prefab Metal structure Steel Construction hotel Building
Features of the Prefab Metal structure Steel Construction hotel Building :
The house is built on light steel structures. It is safe, reliable and durable.
Base-plate and floor plate load capacity is designed as 150kg/m2.
The roof is 60kg/m2.
Earthquake resistance can reach Grade 7.
Wind resistance can reach Grade 12.
Main material of this prefab building:
No. | Name | Description | Thickness(mm) | Color |
1 | external wall panel | 50 mm EPS sandwich panel | ppgi 0.326 | grey white |
2 | internal wall panel | 50 mm EPS sandwich panel | ppgi 0.326 | grey white |
3 | roof purlin | 60×80 SHS | 1 | white |
4 | door | EPS sandwich panel door | ppgi 0.326 | grey white |
5 | window | pvc sliding windows | 1500*100 | white |
6 | flooring board | construction grade plywood | 18mm |
|
7 | roof tile | Corrugated EPS sandwich panel | 0.326 | white/blue/red(if red need 500m2 qty) |
8 | floor purlin | 12#C section steel | 1.8 | white |
9 | column | 100×100 SHS | 2.0 | white |
10 | ring beam | 60×80 SHS | 1.8 | white |
11 | walkway board | 3 mm checkered plate | 3.0 | black |
12 | roof transverse beam | 100×100 SHS | 1.8 | white |
13 | floor transverse beam | 18#C section steel | 2.0 | white |
14 | staircase beam | 16#C section | 2.0 | black |
The drawing of Prefab Metal structure Steel Construction hotel Building:
This modular home will not produce building rubbish. So we also call it green house. It is environment-friendliness.
For it is easy assembling and disassembling. Then it can greatly saves costs, construction time and labor.
Customers feedback:
Prefab K House ↑ Container House ↑ Modular T House ↑
Sentry Box↑ Prefab SHS Building↑ Light Steel Villa↑
Q 1: What are your main products?
A: Our man products have prefab K house, T house, SHS house, H house, container house, light steel structure villa, steel structure warehouse, sentry box, sandwich panel and other constructive materials.
Q2: What will client provide before factory offers good quotation?
A: When we receive inquiry from client, client please fills purchasing intention sheet, providing us with information of house dimensions, draft drawing, layout and materials for prefabricated house. We will design the drawings and offer competitive quotation with the above information.
Q3: What are main materials of prefabricated house?
A: Our prefabricated house materials mainly include light steel structure, sandwich panel, roof tile, door, window, covers, screws and other accessories.
Q4: How you calculate the total area?
A: Industry calculation rule as below:
Q5: What drawing of house will factory supply?
A: Plan drawing, elevation drawing, sectional drawing, foundation drawing, installation drawing.
Q6:How many types of sandwich panel do you have?
A: We have EPS(polystyrene)sandwich panel, rock wool sandwich panel, and PU(polyurethane)sandwich panel.
The characteristics of your sandwich panels respectively:
Q7: How many colors do your sandwich panels have?
A: Offwhite, ivory white, blue, green and red color.
Q8: What is the life expectancy of prefabricated house?
A:10-15years.
About Max Prefab
We are an innovative company with great commitment, contribution heart, passion and responsibility.
We are specialized in designing, manufacturing andbuilding high quality environmental prefabricated house, steel structure warehouse, container house, mobilesteel villa, sentry boxes, porta cabins,portable toilets and so on.
Our main processing steps include accurate measuring, cutting, welding, de-oiling, grinding, polishing, rust cleaning, primer painting,surface painting and packing, each step of manufacture is under exact measurement and responsible working attitude to guaranteed our quality and client benefit.
Our concept is simple and direct- to maximize your value and prefab your dreams within shorter time and higher quality. We try our best everyday to provide better products and service by setting up a more convenient system for you to take decisions.
That is why we called MAX PREFAB.
To Become the World's Best Trade Partner of Prefabricated House
To create a respectable international company in China
Our game objective is to WIN.
The only method of winning the game is treating myself as a leader, to accumulate the most and possible postive communication and effective action to make contributions to the others, influence others, make others great, make myself great.
Why US?
We are innovative and have been integrating the relevant green materials all the time for the complete turnkey solution
8. We are sharing a long term cooperation and co-development vision with you!
We sign sole agency agreements and we are together as a whole! Wining is just a result of our friendship.
Welcome to Join us!