2014 newest high quality automatic mineral water beer manufacturing plants for sale
USD $1,000 - $100,000 /Set
Min.Order:1 Set
Guangzhou Tengmeng Light Industry Machinery Co., Ltd.
Automatic mineral water manufacturing plants for sale
This machine is suitable for the filling of liquid products in cosmetics like perfumem sterilization water, wine ,soy sauce, peanut oil, oyster sauceand lubricant oil etc. It's the latest filling machine with complete funtion. Customized design for more filling heads.Easy to clean if filling colored materials.
Technical parameter
filling volume(ml) | 25-250ml,50-500ml,100-1000ml,250-2500ml |
filling speed(B/H) | 10-90(adjustable) |
filling nozzles(pcs) | 1-2-4-6-8-10-12 |
power(kw) | 0.5-1.5 |
working pressure | 5-7kg/m² |
filling accuracy | ±1% |
dimension(mm) | 2000×1300×2100 |
net weight(kg) | 650 |
Work principle
A. Through the cylinder's movement of forward and backward to make the piston which is located in the cylinder do reciprocating movement, so as to occur the negative pressure in the preceding chest of the cylinder.
B. The piston is pulled backward when the cylinder make forward movement, the material cylinder occurred negative pressure, the materials in the barrel are pressed into the feeding pipe by pressure and go into the material pipe through unidirectional valve of feeding and discharging materials.
C. The piston is driven forward when the cylinder make backward movement, the materials are pressed and go into discharging pipe through unidirectional valve of discharging materials, finally filled into the empty bottle which need to be filled, then one time filling finished.
D. It is a single and simple action to each time of filling for the piston filling machine, so it has very high filling precision and stability to every regular container.
Solutions to the Failure
Failure | Solution |
Piston can’t make forward and backward movement | A. check if the air compressor is switched on |
B. check if the air compressor valve is switched on | |
C. Check if the air source switch is open, switch on the air control security valve | |
D. Check if the air pressure reach 4-5kg/cm² | |
E. Check if the unidirectional valve installed in the right position | |
F. Check if the piston head, O type ring are viscous the piston is blocked | |
G. Check if the air control switches on the top of the cylinder are damaged | |
Filling precision is not accurate | A. The speed should keep slowly as filling high viscosity products, besides all the parts should be confirmed sealing so that avoid leakage |
B. Check if there are sufficient materials in the hopper or the barrel which provide materials. | |
C. Check if the material cylinder is loosened, the program control switch is loosened. | |
Materials overflows the material cylinder | A. Check and replace the piston head and o type ring |
B. Please use two O type rings as the materials are dilute, and only use two O type rings if necessary | |
can’t suck up materials | A. Check if the valves are installed in the right position. bind tightly. |
B. Check if the feeding pipe is installed in the right position. bind tightly | |
C. Confirm suck up material pipe doesn’t connect the bottom of the barrel | |
Materials overflow the mouth of the container | A. check if the program control switch is damaged or shift
|
B. Check if the filling head aim at the mouth of the container | |
C. Check if the adjustment of the cylinder’s throttle is suitable, incorrect adjustment will lead to the discharging material speed fast. |
Applicable scope of filling materials
water honey sugar acid cheese
fruit juice shower gear oil
liquid coffee ink eye shadow fluid
tea shampoo glue food/paint washing hand fluid cream
milk liquid soap butter syrup plant oil
Our factory
After-sales service:
1.Warranty time: one year, from the date which the product is qualified commissioning.
Any damage except the wrong operation during warranty period is repaired freely.But the travel and hotel expenses should be count on buyer.
2. Commissioning services: the product's installation and commissioning at the demand side, our engineers will not leave there until get your agreement.
3. Training services: our engineers will train your staff to operate it during the period of installation and commissioning,
and they will not leave there until your staff can operate it properly and normally.
4. Maintenance services: any malfunction happened, once you inquiry us, we will reply you within 48 hours except the special reasons.
5. Lifelong services: we provide lifelong services for all the products we sold out, and supply the spare parts with discount price.
6. Certificate services: we can provide related certificates to customers freely according to the request of customers.
7. Inspection services: you can ask the third part inspection company or your inspector to inspect the products before shipment.
8. The file: the Manual Specification, report of the material which used to the equipment and other documents related to the GMP authentication information will be provided by us.
Packaging:
Plywood packging.
Shipping:
· European Countries: 22-28 days
· The United States: East --13-16 days, West--21-28 days
· Brazil: 30-40 days
· Russia: 36 days
· Asia Countries: 3-5days
ATTN:Carrie Lu
Mobile: +86-13660337691
Tel: +86-020-86099489
skype:tengmengmachery02 @ outlook com
♥ To get more new information of the machines or others pls advise and we can specially send some details for you.We would offer any groups of machines you would like to develop.
♥ To know more about us or get latest quotation pls do not hesitate to contact me.
I will reply you soon!
I hope we can establish good relationship!