Crawler mounted drilling rig XY-2L borehole drilling rig
Negotiable /Set
Min.Order:1 Set
Chongqing Huobo Surveying Instruments Co., Ltd.
XY-2L crawler mounted water well drilling rig is developed base on XY-2 Core Drilling Rig, integrating drilling rig, crawler, mast, mud pump and control panel into whole. The rig is a kind of drilling rig which is mainly used for drilling shallow-medium hole for minerals,engineering geological, hydro-geological, water well and pile grouting hole drilling, and especially for where mobility and set up time are imprtant. It is a type of integration and modular drilling equipment with quick migration.
1. Integrated crawler traveling device, mud pump, control panel into one whole;
2, Caterpillar walking, base support, mast landing are all driven by the hydraulic system of drilling rig, it is easy to operate;
3. It is easy to move around and from or to at work site, improve the drilling efficient, and reduce the intensity of labor;
4. Mast landing, folding function for easy walking and transportation.
5. Have more speeds (8-speed), reasonable speed range, and big torque at lower speed, wide applications;
6. Having two reverse speeds, it is easy to handle the accidents.
7. The feed stroke of spindle is 600 mm, help to improve drilling efficiency, reduce blocking and burning of bit, easy to handle drilling accidents.
8. Twin-gear oil pump to supply oil for the hydraulic system of drilling rig, less power consumption, lower temperature of the hydraulic system.
9. Few control levers, reasonable layout, flexible and reliable manipulation.
10. Have normally a closed hydraulic chuck, also equipped with a lower mechanical manual chuck.
ITEMS | VALUES | ||
Drilling depth | 100-350 m | ||
Drilling hole caliber | 300-76 mm | ||
Spindle speed | Forward: | 65; 114; 180; 284; 310; 538;849;1172r/min | |
Reverse: | 51; 242 r/min | ||
Max. spindle torque: | 2900 N.m | ||
Max. pull force: | 60 kN | ||
Spindle stroke: | 600 mm | ||
Max. hoisting force: | 30 kN | ||
Inner dia. of spindle: | 76 mm | ||
Stroke of retraction cylinder: | 304 mm | ||
Distance away from hole | 140 mm | ||
Power unit (option): | Electric motor 22 kW; diesel engine 30 kW | ||
Mud pump (option): | BW-200 | ||
Max. traction pull force of crawler: | 20.3 kN | ||
Crawler walking speed: | 1.2 km/h | ||
Track gradeability of crawler: | less 20° | ||
Specific pressure of track ground: | 0.06 MPa | ||
Height of mast: | 8 m | ||
Hook hoisting load of mast: | 29.4 kN | ||
Crane beam max. static load: | 58.8 kN | ||
Pulley qty of crown block: | 2 pcs | ||
Angle of mast landing: | 0°~ 90° | ||
Overall dimension L*W*H | When transportation | 4320*2104*2995 mm | |
When drilling | 3816*2104*8536 mm | ||
Whole weight: | About 3000 kg |
Package: Plastic sheeting
Delivery: Container ship, 10 days after receiving deposit
Established in 2009.
Chongqing Gold Mechanical & Electrical Equipment Co,. Ltd is a high-tech enterprise specializing in R&D design, manufacture and sale of geological instruments, oil instruments and other precise instruments and equipments.