manual hand drilling machine XY-2BLB foundation drilling tool
USD $29,000 - $29,000 /Set
Min.Order:1 Set
Chongqing Huobo Surveying Instruments Co., Ltd.
XY-2BLB foundation drilling tool
It can work in any terrible condition
Easy to move and operation
perforacion de pozos para agua| tipos de perforacion de pozos| perforacion de pozos horizontales| perforacion pozos profundos para agua| equipo de perforacion de pozos
XY-2BLB diamond core drilling rig is developed based on our XY-2 core drilling rig , integrating drilling rig, crawler, mud pump, console rack and other devices into the integral one. It is mainly targeted at the shallow-medium hole of geology core drilling, and where the mobility is important. It is modular and integral drilling rig.
1 | Drilling depth (NQ drill rod) | Approximately 500m | ||
2 | Spindle speed | Forward | 57; 99; 157; 217; 270; 470; 742; 1024 | |
Reverse | 45; 212 r/min | |||
3 | Spindle Maximum torque | 3200 N·m | ||
4 | Spindle max pulling force | 60 KN | ||
5 | Spindle stroke | 600 mm | ||
6 | Max. lifting force of the hoist with single rope | 30 KN | ||
7 | Inner diameter of the spindle | 96 mm | ||
8 | Retraction distance | 305 mm | ||
9 | Retraction distance for the host drill rig | 330 mm | ||
10 | Retraction distance for both drill rig and tower | 160 mm | ||
11 | Oil pump | SCB32/12 double gear pump | ||
12 | Power unit | engine power | 30 KW 1500 r/min | |
electric motor | 22 KW 1470 r/min | |||
13 | Crawler maximum walking speed | 1.2 km/h | ||
14 | Crawler Climbing capacity | no more than 25 ° | ||
15 | Tracked Ground pressure | 0.042 MPa | ||
16 | Rig height | 8 m | ||
17 | Hook load of the tower | 29.4 kN | ||
18 | Max.static load of crown block beam | 58.8 kN | ||
19 | Quantity of pulley | 2 | ||
20 | Angle range of tower ups and downs | 0°~ 90° | ||
21 | Rig Dimensions ( tower horizontal position ) | (L*W*H) 4450×2166×3080 mm | ||
22 | Total weight | 5500 kg |
1.Core Drilling Machine 2.Water Well Drilling Machine 3.Anchoring Drilling Rig
4.Down-the-hole Drilling Machine 5.Underground Drilling Rig 6.Horizontal Directional Drilling Rig