light and portable aluminium alloy drilling rig XY-3T total weight 700kg,portable for hydro power, foundation
USD $40,000 - $41,100 /Set
Min.Order:1 Set
Chongqing Huobo Surveying Instruments Co., Ltd.
Aluminium Alloy-- 1/3 weight of Steel material XY-3
XY-3 water well drilling machine is mainly used for geological exploration, hydropower project, road and railway construction, buliding project
and big diameter water well drilling project
Whatsapp: +86-13637882559
XY-3T is mainly diamond and carbide drill core drilling equipment, mainly applied to geology, hydrology, engineering, metallurgy and coal industries, can also be used for engineering geological exploration drilling construction, mining and tunnel ventilation, drainage and other projects.
Features:
(1) The application of new types of high-strength light alloy materials. The main parts (vertical boxes, moving boxes, hoists and other) material using pressure casting high-strength aluminum alloy to replace ordinary steel research of new aluminum alloy welding technology, integration applied in the Tower, base; on the premise of ensuring drilling rig, which weighs about 1/3.
(2) modular drilling rig solid design, split more fast Assembly. Split each part maximum weight of about 40-100kg, solved the problem of relocation job difficult in mountainous area.
(3) drill transfer machine structure using high-frequency treatment setting Rails, wear-resisting performance, extending its service life.
(4) Composite transmission design. LG515 automobile transmission design of additional Deputy as speed, high and low speed switch, torque, variable speed range, concentrated and convenient operation, meet the needs of drilling technology and accessories General.
structural style | Spindle |
Power(kW) | 4TNV88-BSBKC 27.1kW 2200rpm |
Dimension(MM) | 2600*900*1750 |
Weight(kg) | 700(power not included) |
Drilling depth(m) | 600 |
Drilling diameter(Max.)(mm) | 219 |
Kelly bar(mm) | 46x51x4200 /Ø50 |
Drill bit(mm) | Ø75- Ø220 |
Rotating speed(r/min) | 57/157/470/942 |
Reel caliber (mm) | 200 |
Single line lifting speed(m/s) | 0.3-1.9 |
Single line hoisting capacity(t) | 2.5 |
Wire rope length(m) | 50 |
Wire rope diameter(mm) | Ø12.5 |
The rated load(t) | 3 |
effective height(m) | 6 |
Tower leg specifications(mm) | Ø73 |
Weight of components:
Component | Weight(kg) | Quantity |
Up shelves and control valve | 168 | 1 |
Down shelves | 100 | 1 |
transfer case | 98 | 1 |
Spindle case | 80 | 1 |
Spindle & hydraulic chuck | 68 | 1 |
Winch | 85 | 1 |
Hydraulic oil tank(oil included) | 58 | 1 |
Diesel engine | 165 | 1 |
Diesel tank(diesel included) | 40 | 1 |
Gearbox | 68 | 1 |
pulley assembly | 36 | 1 |
upper bracket | 100 | 1 |
Left pillar | 69 | 1 |
Up strut | 72 | 1 |
Tower | 42 | 2 |
Down strut | 24 | 2 |
Tower pole 1 | 16.5 | 2 |
Tower pole 2 | 15 | 2 |
Left chassis frame, right chassis frame | 57 | 2 |
Chassis Front arm | 56 | 1 |
Chassis back arm | 21 | 1 |
Ⅰ.Warranty
The main machine has 12-month warranty, excluding the wearing parts, we offer these parts with the lowest price for our customer.
Ⅱ.Installation and Commissioning
A.We provide our customers foundation and layout drawings after payment.
B. If needed, we will send technical engineers to the Buyer’s site for supervision of erection and Commissioning. Expenses abroad should be paid by the buyer.
Ⅲ. Inspection:
A. Customer inspection in factory;
B. Supplier offer pictures for inspection;
C. The third party inspection appointed by Customers.