HGY-200 vertical cheap borehole well drill rig
Negotiable /Set
Min.Order:1 Set
Hunan Flydisc New Material Co., Ltd.
Drilling Rig(HGY-200)
1,Max depth:200m with 75mm(46~250mm)
2,Two patents
3,Hydraulic or ball chuck
4,Angle: 0-360.
Brief introduction:
1.32 years professional manufacture
2. Certificate: ISO9001:2008
3. Export to: Africa, the Middle East, South America, Asia,
Countries: South Africa, Zambia, Sudan, Iran, South Korea, Costa Rica etc.
Two patents for HGY-200 drilling rig:
Utility patent for transmission case.
Design patent for appearance.
Drilling Ability:
Drilling depth: 200m
Drill hole diameter: 75mm(46~250mm)
Max successful drilling depth: 427m, 478m with 75mm hole diameter
Features:
1) Good stability and high reliability.
2) Multilevel positive and reverse rotate speed.
3) The complete hydraulic chuck and vertical spindle.
4) Convenient to transport with the small volume and light weight.
5 )Perfect frame's rigidity ,low center of gravity and good stability.
Technological Data of Drilling Rigs:
Model | Drilling Rig(HGY-200) |
Drilling depth( m) | 200 |
Drilling rod diameter.(mm) | Φ50/Φ42 |
Head angle range | 360° |
Movable cylinder stroke (mm) | 360 |
Spindle speed( r/min) | Positive rotation rate:60 150 240 340 550 830 Reverse rotation rate: 35 85 135 195 330 480 |
Spindle hole diameter( mm) | Φ63/Φ95 |
Spindle output torque max(N.M) | 1700 |
Spindle stroke(mm) | 500 |
Lifting power max( KN) | 50 |
Driving force max(KN) | 37 |
Lifting speed( m/s) | 0.6 2.3 3.4 |
Lifting capacity(single) max(KN) | 20 |
Steel wire rope diameter (mm) | Φ11 |
Mode of chuck | hydraulic chuck or pillar-type chuck |
Weight(power unit excepted)(Kg) | 750 |
Overall dimensions(mm) | 1860*800*1400 |
Diesel engine model | HGY-200C/D/E Zs1110 ( 14.7KW) HGY-200F Zs1115(16.2KW) |
Electromotor model | Y160L-4 ( 15KW) |
Use: for geotechnical investigation, exploring, prospecting, water well drilling;
Widely used in the construction of the projects e.g. prospection, railway, road, port, bridge, water conservancy and hydropower, tunnel, well, industrial and civil construction, geological exploring, large diameter boring pile and small diameter diamond core deep hole drilling, etc.
Our company has produced drilling equipments for 50 years. We have passed ISO9001:2008, TS16949, CE Certification, MA Certification, High-tech Enterprise Certification.
The rigs are widely used in the construction of the projects e. g. prospecting, railway, road, port, bridge, water conservancy and hydropower, tunnel, well, industrial and civil construction, geological exploration, large diameter boring pile and small diameter diamond core deep hole drilling, etc. The main products are engineering geological drilling rig;water well drilling rig; vertical shaft 100, 200, 300, 650, 1000, 1500m rigs, full hydraulic power head 1000, 2000m rigs. At the same time, we produce drill bits and drill tools matching with the drilling rigs. Many rigs and drill bits possess patent certificates. Our products have exported to many countries of world. Such as Nepal, India, SriLanka, Afghanistan, Malaysia, Iran, Sudan, Chile etc.
Our Factory | our team of foreign trade | In 1992,100m drill in Antarctica in the world | Go to driiing site to train drilling knowledge |
Q:Rig using common sense?
Answer:
(1) class maintenance:
The outer surface of the drill is wiped clean, and pay attention to the rig substructure slideway, vertical surface cleaning and good lubrication.
The examination of all open bolt, nut, insurance and other solid and reliable.
According to the lubrication requirements of the lubricating oil or grease, see Figure two and table a.
The check gearbox, gear box and the hydraulic system the location of oil tank.
The check around the oil leakage and as the condition to be treated.
The elimination in the class occurred within the other fault.
(2) peripheral maintenance:
The complete class maintenance programs required.
The removal of chuck and slips on the tooth surface dirt, mud.
The clean the inner surface of the brake oil, mud.
The excluded from this week 's fault.
(3) month maintenance:
The complete class, weekly maintenance programs required.
The disconnect chuck, cleaning slips and slips seat. Should be replaced if damaged.
The cleaning tank filter, replacement of deterioration or soiled by hydraulic oil.
The examination of the major components of the intact state, should be replaced if damaged, can not be wounded the work.
The complete elimination of the fault occurred in the month.
And if the drill does not use for a long time, the display part (especially the processing table. ) should becoated with grease.