Road Safety Line Marking Machine
USD $1,600 - $12,000 /Piece
Min.Order:1 Piece
Guangzhou TOP WAY Road Machinery Co., Ltd.
Road Safety Line Marking Machine
This machine is made up of a hydraulic system, a pneumatic system, a mechanical system, and a microcomputer system, can complete the construction of baseline and vibrating line at one time and mark lines with different bulge length and bulge spacing by controlling the microcomputer.
Features
lThe hydraulic step less transmission device can make the machine walk automatically, which is faster and more effective.
lFor traditional self–propelled vibrating marking machines, the liquefied petroleum gas tank is too taller than operator that their sight is blocked. Our new model overcame this disadvantage by rearranging the hydraulic system, pneumatic system, mechanical system and the microcomputer system, which makes the machine structure more reasonable and user-friendly. The most important thing is that the total weight of the machine is 50KG lighter.
Image
lThe new designed vibrating marking hopper adopted several kinds of new materials and is more durable than ordinary hopper. The new arrangement of the pneumatic system and mechanical system on the vibrating hopper contribute to fewer breakdowns of the air cylinder and electric equipment by keeping the air cylinder far away from heat source.
lLines of different bulge length and bulge spacing can be marked by adjusting the control panel of the microcomputer.
lThe hydraulic system, pneumatic system and microcomputer system we adopted are all well-known international brands, which make our vibrating marking machine function better.
Technial parameters
Outer dimensions(L*W*H) | 1400 X1100 X1100mm |
Total weight of machine | 220kg |
Capacity of glass beads box | 10kg |
Weight of paints to be melted: | 115kg |
Gasoline engine power | HONDA gasoline engine of 5HP |
Working pressure | 0.5Mpa |
Walking installment: | Hydraulic pressure step less speed regulation |
Walking speed | 0-10km/h |
Lineation speed | >400m/h(depending on coat, baseline thickness and bulge thickness) |
Gradient | 30%(about 16.5º) |
Bulge height | 1-10(depending on the quality of paint) |
Bulge spacing: | 1-999mm within error of ±5mm |
Bulge length | 1-999mm within error of ±5mm |
Bulge width | Standard models Hopper of 150mm. made up of three lines with each 25mm Hopper of 200mm. made up of four lines with each 25mm Hopper of 300mm. made up of four lines with each 25mm |
Baseline thickness | 1-5mm |
Glass dead dispense method | Gear driven, automatically clutch, fine adjustment dispense amount |
Heating method | 15kg liquefied petroleum gas |
Electrical Control board
Vibrating Diamonds (3 or 4 diamonds despending on the hopper, the diamonds spacing can be adjusted by electrical control board)
Cooperated Machines