Road Marking Device for Hot Melt Kettle Paint
USD $1,301 - $4,500 /Piece
Min.Order:1 Piece
Guangzhou TOP WAY Road Machinery Co., Ltd.
Small Size Machine for Road Marking Machine
1. Brief Introduction
A mutifunctional hand-pushing machine integrated with hot-melting kettle and kneader marking machine, is applicable to projects like parking lot, school, resisdential neighborhood and factory, which are small amount of work but scattered and fragmented. The machine is small in size and light in weight, easy and conveinient in operation with only two operators for working.
2. Features
1.The machine can mark lines at the same time melting paint.
2.Specialized mid-pressure stove is equipped for industrial use, which has high thermal efficiency and high melting speed.
3.Three movable extraction stacks discharge exhaust gas in time to maintain good working environment.
4.Marking shoes:with durable alloy edging knife and the thickness of line can be adjusted,1.2-4mm.
5.Additional engine driven: decrease labor intensity, increase operation efficiency.
3. Technical parameters
no. | Name | Hand-driven | Engine-driven |
1 | outer dimensions | 1200mm*900mm*1100mm | 1200mm*900mm*1100mm |
2 | empty weight | 220kg | 280kg |
3 | capacity of paint tank | 120kg | 120kg |
4 | bead dispensing method | gear driven, automatically clutch | gear driven, automatically clutch |
5 | marking width | 50mm-500mm | 50mm-500mm |
6 | engine power | no | 5.5HP |
7 | walking speed |
| 0-5km/h |
4. Hot model
1).Hand-driven road marking machine
2). Engine-driven road marking machine
4. Components
1). Stainless steel frame, thermometer, agitator handle
2) Marking Hopper: The line size is according to the marking hopper. (50mm to 500mm)
3) Glass bead dispenser is synchronization with the marking hopper.
5. Job Location
6. Fit for all kinds of roads(small project)
1). Concrete road
2). Asphalt road
3). Parking lot
6. Operating parameters (for reference)
Proportion of glass beads and paint | 1:10 |
1000kg paint can mark | 200-230m³(depend on the coat thickness) |
Bottom oil (increase adhesiveness), proportion of bottom oil and paint | 1:40(asphalt road is ok without bottom oil.) |
Work amount per day | 400m²- 800m² |
7. Exihibition Room
Thank you for scanning our products!
If you have any question, please no doubt to contact us.