ZF120A-1203000 AC DC power adapter 12V 3A with cUL UL CE FCC KC RoHS
USD $4.3 - $6 /Piece
Min.Order:100 Pieces
Shenzhenshi Zhenhuan Electronic Co., Ltd.
ZF120A-1203000 AC DC power adapter 12V 3A with cUL UL CE FCC KC RoHS
ZF120A-1203000 AC DC adapter 12V 3A Specifications
Model | ZF120A-1203000 |
Mode | Constant voltage |
Input | 100-240V AC 50/60Hz, 2.0A |
Output type | Single and DC output |
Output | ZF120A-1203000 AC DC adapter 12V 3A |
Efficiency | 82% min. |
Leakage current | <5mA |
DC cable length | 1.2m/1.5m/1.8m, etc. |
DC jack size | 5.5*2.5*10mm/5.5*2.1*10mm, etc. |
AC plug | US/UK/EU/AU/KR, etc. |
Certifications | cUL UL CE TUV GS FCC KC SAA RoHS CB C-Tick |
Operating temp. | -10°C~+40°C |
Storage temp. | -20°C~+80°C |
Protection | Short circuit, over voltage, over current |
Warranty | 2 years |
Application | LED lighting, LED strip, CCTV camera, LCD monitor, massage chair, etc. |
Optional DC connector
Optional AC plug
Main Products
Shenzhenshi Zhenhuan Electronic Co., Ltd. ( ZHENHUAN GROUP LIMITED ) was founded in 2008, with many years of experience, striving for a stable and energy efficient product. We specialize in the research and development of environment protective and energy-efficieny switching power supplies, AC/DC adapters, power supply, chargers and LED driver, with cUL UL CE TUV GS FCC KC SAA RoHS CB C-Tick certifications.
Our company holds the "Technology first, people-oriented" concept. We follow the "Quality is life" principle. We are in accordance with ISO9001:2000 quality system management standard. We have established a comprehensive quality assurance system.
Welcome friends from all walks of life come to visit, guidance and business negotiation.
Packing
ZF120A-1203000 AC DC power adapter 12V 3A with cUL UL CE FCC KC RoHS
a. 1pc per standard white inner box
b. 60pcs per standard carton
c. according to customers' requirements
Shipping
a. by air
Your order will be delivered by DHL, FEDEX, UPS, TNT, EMS or other International Express. It’s up to you to choose your suitable express company. It normally takes 3-7 days to arrive at your destination. Surcharge will be charged if your destination is remote area.
b. by sea
Shipments will be arranged under FOB conditions.
1. 120 production lines workers;
Question | Answer |
Are you a manufacture? | Yes, 100% |
What is the production lead time? | 3-7 working days due to the production schedule |
What is the payment Term? | TT 30% deposit and 70% balance before delivery |
What is the warranty? | 3 years |
How do I know the production status? | Our sales person will follow your order and notify you on time, also you could reach us by SNS Tool to get Live picture and video |
What is the MOQ? | 100PCS |
Could I visit your factory? | We welcome you doing that! |
Could I have third Party to QC the product? | Sure. |