FRP septic tank for sewage treatment
USD $1 - $10,000 /Set
Min.Order:1 Set
Wuxi Mingzhou Environmental Protection Machinery & Equipment Factory
FRP septic tank for sewage treatment
Introduction:
Integrated biological FRP Septic tank, has excellent cleaning ability, high compressive strength, environmental protection, energy saving, low carbon, no leakage, corrosion resistance, low construction cost, short construction period, service life is as long as the buildings.
Application:
Used for domestic sewage treatment for residential, office buildings, hotels, restaurants, schools, hospitals, barracks, Toilet, district municipal reform and other places. Also for drainage treatment for food processing enterprises.
Technical parameters:
Construction Description:
1. Dig foundation pit: according to the instructions that includes septic tank type, size, elevation, put the line of pit excavation.If the underground water level is high, must be timely drainaged and set appropriateslope to prevent the collapsing.
2.Base cushion: covered sand thickness 50-100mm, removing the larger sharp masonryor hard debris and leveling compaction. The septic tank with a volume above 20m ³ shall make a 150 concrete cushion to maintain whole products settlement together. The FRP septic tank is installed.
3.Installation: When lifting please check outwhether FRPseptic tank water inlet and outlet direction and elevationmeet the engineering drawings.
4.Layered backfill: Prohibited the construction waste as the soil to backfill. Large sharp stones should be removed. Backfill soil shall be compacted layer by layer, preferablyuse artificialconsolidateand water compactionavoid locality violently impacting. Must comply with the provisions about construction specifications backfill jobs .
5.Septic tank irrigation: After installation in place, be filled with water and sand backfill to maintain stable position and prevent floatingor displacement.
6.Check and production: You can build brick inspection well as well as the corrugated pipe socket well.
7. Well connected: according to general sewer graph construction, strictly implement of engineering design elevation values.
This product is suitable for the green belt, road and parking lot.If the septic tank top under vehicle load, please ask for "pavement load-bearing construction diagram”