high quality plastic injection single face pallet mould
USD $68,000 - $70,000 /Set
Min.Order:1 Set
Taizhou Huangyan Ena Mould Co., Ltd.
ENA mould is specializing in crate mould, pallet mould, paint bucket mould, food container mould, flower pot mould and garbage bin mould. For the detailed of the company information, please view our "company profile" on alibaba carefully. You will get a completed view of this company.
single face pallet mould
2. Detailed description of the Pallet Mould:
Basic mould information:
Runner Type | Hot runner |
Mould Size | 1700*1500*1800 |
Mould Weight | 16Ton |
No. of Cavity | 1 cavity |
Product Size | 1200*1000*170mm |
Product Material | HDPE |
Product Weight | 20Kg |
Pallet Style | Single faced |
Entry Type | 4-Way |
Load capacity | 1200-1400Kg for dynamic load; 2500-3000Kg for static load; |
Delivery Time | 75days |
There are three levels of mould quality for your option.
Option A: Level A quality (Highest Level Quality)
Mould Base: 45# Steel
Core/Cavity: P20+PeCu
Slider/Insert: P20
Mould spare parts: Jinghong China
Hot Runner: Yinghao China
Mould Life:500,000 shots
Cycle Time:285s
Option B: Level B quality (Highest Level Quality)
Mould Base: 45# Steel
Core/Cavity: P20
Slider/Insert: P20
Mould spare parts: Jinghong China
Hot Runner: Yinghao China
Mould Life:500,000 shots
Cycle Time:300s
Option C: Level C quality (Middle Level Quality)
Mould Base: 45# Steel,self-made
Core/Cavity: 45#
Slider/Insert: P20
Mould spare parts: Jinghong, China
Hot Runner: Hongying,China
Mould Life:300,000 shots
Cycle Time:300s
Attention pls:
Price varies in different quality level. When you send us the mould inquiry, please offer the following information:
1) Quality level you choose: Level A/Level B/Level C
2) Pallet Photo
3) Pallet Dimension: L*W*H
4)Pallet Type
3. Pallet Mould Making Process
Processing | Time |
Prepare Steel | 7 days |
CNC Machining | 15 days |
Wire Cutting | 15 days |
Drill | 8 days |
Precision CNC Machining | 15 days |
EDM | 10 days |
Polishing | 3 days |
Assembling and Fitting | 1 days |
T1 mould test | 1 days |
Total: It is 75 days for first mould testing after mold design is confirmed.
4. Pallet Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking (Hardness, flaw detection)
- Mould Standard Spare Parts Checking (hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- Each part of mould’s size checking after machining according to 2D drawing
- mould testing(check mould running condition)
3.check with customer’s requirement again before mould shipping.
5.Pallet Mould Pack and Shipping
Anti-rust oil is painted first, then Plastic film, and finally Wooden Case.
Sent together with the mould:
a) Mould manual instruction
b) engineering drawing in flash disk
c) one more set of mould spare parts: heater, ejector pin, bush, water nozzle, water pipe, hanging ring.
6. Pallet Mould Maintenance
a) When the mould is vacant, spray the anti-rust oil
b) To clean the gate and cooling system regularly
c) Avoid to use recycled material if the mould is suitable for virgin material only
7. After-Sale Service
a) If you are located in India, you can contact our Indian maintenance shop in Delhi.
b) Engineering and one interpreter can be sent to customer’s factory for first running.
c) one-year after-sale technique support