2014 Hot Selling Injection Plastic Dustbin Mould Making
2014 Hot Selling Injection Plastic Dustbin Mould Making
2014 Hot Selling Injection Plastic Dustbin Mould Making
2014 Hot Selling Injection Plastic Dustbin Mould Making

2014 Hot Selling Injection Plastic Dustbin Mould Making

USD $80,000 - $100,000 /Set

Min.Order:1 Set

Supply Ability:
10 Set / Sets per Month
Port:
Ningbo/Shanghai/Hangzhou
Payment Terms:
Credit Card

Quick Details View All >

Place of Origin:
Zhejiang, China
Brand Name:
ENA
Model Number:
ENA-0387
Shaping Mode:
Plastic Injection Mould
Product Material:
Plastic
Product:
Other, Industrial Product

Taizhou Huangyan Ena Mould Co., Ltd.

Business Type: Manufacturer
Taizhou Zhejiang China
Main Products: Mold/Mould ,Plastic Mold/Mould ,Injection Mould ,Injection Moulding ,Bucket Mold

Product Details

1.The series of Dustbin Mould Making we have made

ENA Mould is specializing in crate mould, pallet mould, paint bucket mould, food container mould, flowerpot mould and garbage bin mould. For the detailed of the company information, please view our ‘’company profile’’ on Alibaba carefully. You will get a completed view of this company.

2014 Hot Selling Injection Plastic Dustbin Mould Making2014 Hot Selling Injection Plastic Dustbin Mould Making2014 Hot Selling Injection Plastic Dustbin Mould Making2014 Hot Selling Injection Plastic Dustbin Mould Making2014 Hot Selling Injection Plastic Dustbin Mould Making 

 

 

2.Detailed description of the Dustbin Injection Mould  :

Basic mould information:

Runner Type

Cold runner

Mould Size

760*730*1000mm

Mould Weight

4000Kg

No. of Cavity

1 cavity

Product Size

390*400*580mm

Product Material

PP

Product Weight

1650g

Surface finish

polish

Delivery Time

55 days

 

There are three levels of mould quality for your option.

Option A:  Level A quality (Highest Level Quality)

Mould Base: LKM,45# Steel

Core/Cavity: 718H+Becu

Slider/Insert: 718H

Mould spare parts: SKD

Hot Runner: YUDO

Mould Life:800,000 shots

Cycle Time:60s

 

Option B: Level B quality(Middle Level Quality)

Mould Base: 45# Steel,self-made

Core/Cavity: 718H

Slider/Insert: 718H

Mould spare parts: Jinghong, China

Hot Runner: Hongying,China

Mould Life:800,000 shots

Cycle Time:70s

 

 

Option C: Level C quality(Lowest Level Quality)

Mould Base: 45# Steel,self-made

Core/Cavity: P20

Slider/Insert: P20

Mould spare parts: Jinghong,China

Hot Runner: Hongying,China

Mould Life:500,000 shots

Cycle Time:75s

 

Attention pls:

Price varies in different quality level. When you send us the mould inquiry, please offer the following information:

1) Quality level you choose: Level A/Level B/Level C

2) Garbage in Photo

3) Garbage in Dimension: L*W*H

4) Garbage in capacity:* L

 

 

3. Dustbin Injection Mould Making Process

 

Processing

Time

Prepare Steel

8 days

CNC Machining

13 days

Precision CNC Machining

15 days

Drill

5 days

Polishing

7days

Assembling and Fitting

5 days

T1 mould test

2 days

 Total: It is 55 days for first mould testing after mold design confirmed.

 

3.1 DESIGN STAGE                              

 2014 Hot Selling Injection Plastic Dustbin Mould Making2014 Hot Selling Injection Plastic Dustbin Mould Making2014 Hot Selling Injection Plastic Dustbin Mould Making

 

3.2 Mould Testing

 

 

2014 Hot Selling Injection Plastic Dustbin Mould Making2014 Hot Selling Injection Plastic Dustbin Mould Making2014 Hot Selling Injection Plastic Dustbin Mould Making 

4. Garbage Cans Moulding Quality Control

For the Q/C of mould, there are 3 steps:

1.Mould Material Q/C

- Mould Steel Checking(Hardness, flaw detection)

- Mould Standard Spare Parts Checking(hardness, size, flaw checking)

2. Mould Making Process Q/C

- design checking (part design, mould design, mould engineering drawing)

- Each part of mould’s size checking after machining according to 2D drawing

- mould testing(check mould running condition)

3.check with customer’s requirement again before mould shipping.

 

5. Garbage Cans Moulding Pack and Shipping

Anti-rust oil is painted first, then Plastic film, and finally Wooden Case.

Sent together with the mould:

a)      Mould manual instruction

b)      engineering drawing in flash disk

c)      one more set of mould spare parts: heater, ejector pin, bush, water nozzle, water pipe, hanging ring.

 

6. Garbage Cans Moulding Maintenance

a) When the mould is vacant, spray the anti-rust oil

b) To clean the gate and cooling system regularly

c) Avoid to use recycled material if the mould is suitable for virgin material only

 

7. After-Sale Service

 a) If you are located in India, you can contact our Indian maintenance shop in Delhi.

 b) Engineering and one interpreter can be sent to customer’s factory for first running.

 c) one-year after-sale technique support

 

 

Contact Supplier

Ms. Tina Wu Sales Manager Chat Now
Telephone
86-576-81108366
Mobile
13291678103
Fax
86-576-81108365
Address
No.6 Chaoyuan Rd,Industrial North,Huangyan Taizhou,Zhejiang

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Hi~