Professional Plastic Injection High Quality Commodity Moulds
USD $80,000 - $100,000 /Set
Min.Order:1 Set
Taizhou Huangyan Ena Mould Co., Ltd.
1.The series of Commodity Moulds we have made
ENA Mould is specializing in crate mould, pallet mould, paint bucket mould, food container mould, flowerpot mould and garbage bin mould. For the detailed of the company information, please view our ‘’company profile’’ on Alibaba carefully. You will get a completed view of this company.
2.Detailed description of the Dustbin Injection Mould :
Basic mould information:
Runner Type | Cold runner |
Mould Size | 760*730*1000mm |
Mould Weight | 4000Kg |
No. of Cavity | 1 cavity |
Product Size | 390*400*580mm |
Product Material | PP |
Product Weight | 1650g |
Surface finish | polish |
Delivery Time | 55 days |
There are three levels of mould quality for your option.
Option A: Level A quality (Highest Level Quality)
Mould Base: LKM,45# Steel
Core/Cavity: 718H+Becu
Slider/Insert: 718H
Mould spare parts: SKD
Hot Runner: YUDO
Mould Life:800,000 shots
Cycle Time:60s
Option B: Level B quality(Middle Level Quality)
Mould Base: 45# Steel,self-made
Core/Cavity: 718H
Slider/Insert: 718H
Mould spare parts: Jinghong, China
Hot Runner: Hongying,China
Mould Life:800,000 shots
Cycle Time:70s
Option C: Level C quality(Lowest Level Quality)
Mould Base: 45# Steel,self-made
Core/Cavity: P20
Slider/Insert: P20
Mould spare parts: Jinghong,China
Hot Runner: Hongying,China
Mould Life:500,000 shots
Cycle Time:75s
Attention pls:
Price varies in different quality level. When you send us the mould inquiry, please offer the following information:
1) Quality level you choose: Level A/Level B/Level C
2) Garbage in Photo
3) Garbage in Dimension: L*W*H
4) Garbage in capacity:* L
3. Dustbin Injection Mould Making Process
Processing | Time |
Prepare Steel | 8 days |
CNC Machining | 13 days |
Precision CNC Machining | 15 days |
Drill | 5 days |
Polishing | 7days |
Assembling and Fitting | 5 days |
T1 mould test | 2 days |
Total: It is 55 days for first mould testing after mold design confirmed.
3.1 DESIGN STAGE
3.2 Mould Testing
4. Garbage Cans Moulding Quality Control
For the Q/C of mould, there are 3 steps:
1.Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- Each part of mould’s size checking after machining according to 2D drawing
- mould testing(check mould running condition)
3.check with customer’s requirement again before mould shipping.
5. Garbage Cans Moulding Pack and Shipping
Anti-rust oil is painted first, then Plastic film, and finally Wooden Case.
Sent together with the mould:
a) Mould manual instruction
b) engineering drawing in flash disk
c) one more set of mould spare parts: heater, ejector pin, bush, water nozzle, water pipe, hanging ring.
6. Garbage Cans Moulding Maintenance
a) When the mould is vacant, spray the anti-rust oil
b) To clean the gate and cooling system regularly
c) Avoid to use recycled material if the mould is suitable for virgin material only
7. After-Sale Service
a) If you are located in India, you can contact our Indian maintenance shop in Delhi.
b) Engineering and one interpreter can be sent to customer’s factory for first running.
c) one-year after-sale technique support