High Quality Blow moulding
USD $800 - $1,200 /Set
Min.Order:1 Set
Taizhou Huangyan Ena Mould Co., Ltd.
supply high quality plastic bucket moulding, plastic bucket maker, custom injection bucket mold
China huangyan square 20 liter plastic pail bucket mould with lid
2016 New product factory price oem custom 20L plastic paint bucket mould
hot selling factory cheap price different size plastic paint bucket mould
ENA mould is specializing in crate mould, pallet mould, paint bucket mould, food container mould, flower pot mould and garbage bin mould. For the detailed of the company information, please view our ‘’company profile’’ on alibaba carefully. You will get a completed view of this company.
blow moulding
Detailed description of Mould:
Basic mould information:
Runner Type | Cold Runner |
Mould Size | 560*530*610mm |
Mould Weight | 810Kg |
No. of Cavity | 24 cavity |
Product capacity | 160mm |
Product Material | pp |
Product Weight | 3g |
Wall thinkness | 1.2mm |
Surface finish | High polish |
Delivery Time | 40 days |
There are three levels of mould quality for your option.
Option A: Level A quality (Highest Level Quality)
Mould Base: LKM, 45# Steel
Core/Cavity: S136+Becu
Slider/Insert: S136
Mould spare parts: SKD 61
Hot Runner: YUDO
Mould Life: 1,000,000 shots
Cycle Time: 28s
Option B: Level B quality (Middle Level Quality)
Mould Base: 45# Steel, self-made
Core/Cavity: 718H
Slider/Insert: 718H
Mould spare parts: China Brand
Hot Runner: China Brand
Mould Life: 800,000 shots
Cycle Time: 30s
Option C: Level C quality (Lowest Level Quality)
Mould Base: 45# Steel, self-made
Core/Cavity: P20
Slider/Insert: P20
Mould spare parts: China Brand
Hot Runner: China Brand
Mould Life: 5,000,000 shots
Cycle Time: 32s
Attention pls:
Price varies in different quality level. When you send us the mould inquiry, please offer the following information:
1) Quality level you choose: Level A/Level B/Level C
2) Paint Barrel Photo
3) paint Barrel capacity
4) paint Barrel wall thickness
Mould Making Process
Processing | Time |
Prepare Steel | 7days |
Surface Dealing | 3days |
Lathe, Crude Machining | 7days |
Drill | 4days |
Heat Treatment | 5days |
Lathe, Precision Machining | 8days |
Precision CNC | 5days |
Polish | 6days |
Assembling and Fitting | 3days |
T1 mould test | 2days |
Total: It is 40 days for first mould testing after mold design is confirmed.
Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking (Hardness, flaw detection)
- Mould Standard Spare Parts Checking (hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- Each part of mould’s size checking after machining according to 2D drawing
- mould testing (check mould running condition)
3. Check with customer’s requirement again before mould shipping.
Mould Pack and Shipping
Anti-rust oil is painted first, then Plastic film, and finally Wooden Case.
Sent together with the mould:
a) Mould manual instruction
b) engineering drawing in flash disk
c) One more set of mould spare parts: heater, ejector pin, bush, water nozzle, water pipe, hanging ring.
Mould Maintenance
a) When the mould is vacant, spray the anti-rust oil
b) To clean the gate and cooling system regularly
c) Avoid using recycled material if the mould is suitable for virgin material only
After-Sale Service
a) one-year after-sale technique support