Prefab heavy steel structure building for mine concentrator
USD $850 - $950 /Ton
Min.Order:100 Tons
Luoyang Juya Engineering Construction Co., Ltd.
Steel structure building for mine concentrator including:
1.The belt gallery
2. Warehouse
3. Workshop
1.Steel structures loaded in 40'OT,roof and wall loaded in 40'HQ
2.30 days after receipt of 30% down payment,the balance 70% paid before shipment.
1. Specialized in designing according to customer's request;
2. Effective production;
3. Strict quality control during the production process;
4. Detailed installation instructions and site supervision;
5. Long-term maintenance
Item | Description |
Company name | Luoyang Juya Engineering construction Co., Ltd |
Factory area | 25000 square meters |
Staff | 300+ |
Certification | ISO9001 & ISO14001 & Safety in Production & Overseas Contracting Project Qualification |
Production capacity | 8000t/ year |
Product | We can offer the integrated system solution from designing to manufacturing and installation |
Main production line | 1. Two lines for steel structure workshop, warehouse, shopping mall, exhibition hall series 2. One line for light steel structure villa 3. One line for large span space heavy structure, like bridge and tower |
Representative projects | 1. Material production workshop for Luoyang Refractory (Group) Co., LTD. 2. Production workshop for China Silicon Corporation Ltd. 3. Leather production factory for PT. LIPPO GROUP, Jakarta, Indonesia 4. Heat treatment workshop in Ghana, Africa. |
Transportation | Loaded in 40’OT and 40’HQ |
Payment | T/T 30% in order and T/T 70% before delivering the goods And the L/C is also available. |
1. Gave me your idea,I will give you characteristic architecture design;
2. Environmental protection;
3. As factory,I can give you reasonable and competitive price.