Factory made Customized metal furniture parts processing,hardware folding table parts
USD $0.1 - $15 /Piece
Min.Order:1 Piece
Dongguan HY Hardware Products Co., Ltd.
Regarding the CNC Machining, the fitting is important also, we can do the fitting test
to simulate the real status during working to make sure the function is good.
If you don’t have the drawing for the components you want, don’t worry, we can do
the reverse engineering to measure the dimensions and profile then get its drawing.
Material (Metals) | Material (Plastic) |
Alloy (Aluminum, Zinc, Magnesium, Titanium) | ABS, PC/ABS, PMMA (Acrylic), |
Brass, Bronze, Beryllium, Copper | PA (Nylon), PP, PE, TPO |
Carbon Steel, Stainless steel, SPCC | Fiberglass Reinforced Plastics, Teflon |
Surface treatment (Finish) | Tolerance |
High polish, Brush, Sand blast. | Straightness : ±_____ 0.001mm |
Lacquer painting, Powder coat, Anodization. | Diameter (outer/inner): ±_____ 0.001mm |
Plating (Nickel, Chrome), Silk screen, Pad Printing | Length (over _____ mm): ±_____0.001mm |
Quality Control | Lead time & Packing |
100% inspection on all critical dimensions. | 7~10 days for sample, 15~25 days for production |
3 axis measurement ( CMM) | 3~5 days via express: DHL, FedEx, etc. |
2D Projector, Air gauge, Thread gauge. | Standard export carton with pallet |
Hardness, Caliber, etc. | Paper, Foam, PE bag for well protection if needed. |
Third Party inspection available if request. | Fast Delivery |
Equipment | Intended Application |
CNC Machining Centers | Machine, Engine components/ parts |
CNC Turning Centers | Turbine components / parts |
Flat end mill, Ball end mill | Hydraulic components / parts |
Face mill, Twist mill | Shafts, Valves, Pins, Thread Rods |
Reamer | Spindles, Sockets, Bushing |
Drilling | Assembly, Fitting. |
Boring, Counter boring | Die casting Tooling (Mold) |
Tapping | Die casting parts |
Grinding | CNC Machining parts, Lath parts, |
Lathe | Assembly Jig / Fixture Design and fabrication. |
Item description: Factory made Customized metal furniture parts processing,hardware folding table parts | Fitting Jig / Fixture Design and fabrication. |
Our company other products show:
How to Guarantee Quality?
Business Scope and Services
Precision Facilities and Processing technology
DGHY Competitive Advantages
Packing & Delivery System
Payment Term
Payment term: 50% Deposite, 50% before shipping.
FAQ for metal furniture parts
1) Are you factory or trade company?
We are factory, so we can offer you very competitive price and very fast lead time, our
sample lead time is 3~7 days, mass production lead time is 15~20 days.
2) Whether some samples can be provided?
Yes, just need some sample cost, we will return it back when proceed into mass production.
3) Will my drawing be safe after you get it?
Yes, we will not release your design to third party unless with your permission.
4) How to deal with the parts received when they are found to be in poor quality?
Please rest assured that all our products are QC inspected and accepted with inspection
report before delivery and generally there will no non-conformance; in case of non-
conformance, please contact us immediately, take some pictures, we will check on the
problems and have them reworked or repaired at the first time with , the resulting
transportation costs borne by our company.
Thank you for your time!please feel free to contact us for further detial! We accpet trial order before mass-production. We are looking forward to establishing long-lastting business relationships with you in the near future.