90% of the recycle utilization large span factory building of steel structure

90% of the recycle utilization large span factory building of steel structure

USD $45 - $66 /Square Meter

Min.Order:100 Square Meters

Supply Ability:
6000 Square Meter / Square Meters per Month
Port:
Qingdao
Payment Terms:
T/T

Quick Details View All >

Standard:
AISI, ASTM, BS, DIN, GB, JIS
Grade:
steel
Dimensions:
GB
Place of Origin:
Henan, China
Brand Name:
B.R.D
Model Number:
B.R.D-003

Henan BRD New Materials Co., Ltd.

Business Type: Manufacturer,Trading Company
Xuchang Henan China
Main Products: Pu Sandwich Panel ,Container House ,Thermal Insulation and Decorative Board ,Steel Structure ,Cold Room Sandwich Panel ,Rockwool Sandwich Wall Panel

Product Details

Specifications

factory building of steel structure
1.recycling and long life
2.Large span big room
3.easy installation

  90% of the recycle utilization large span factory building of steel structure

 

Features

 1) Antiseismic: most villas use slope roofing which usually use truss system. 

 

2)Good Performance for against wind: light weight, high strength, good integrity

 

3) Durability: light gauge steel building uses cold-formed galvanized 

 

4) Heat Preservation Performance: Heat preservation.

 

5) Fire Resistance.

 

 

6)Sound-proof Performancefor windows.

7)Healthiness: dry construction, minimum waste to the environment, and 100% recyclable of the material.

 

90% of the recycle utilization large span factory building of steel structure

 

 

Range of application

 

1. long span structure

 

stadium, gym, convention center, hall, theatre, hangar, engine house.

 

2. high-rise buildings 

 

NewYork Sears tower: 110 layer, 443m high.

 

ShenZhen Ditu commerial building: 368m high.

 

Shanghai Jinmao tower:88 layers, 420.5m high.

 

3. industrial construction

 

workshops for steel-making, hip hull, hydraulic press with large-tonnage hoist. 

 

4. removable structure

 

steel trestle, mobile platform. Canada has built a 1.2 millon ton offshore production platform can accommodate 5,000 workers.

 

 

90% of the recycle utilization large span factory building of steel structure

 

 

90% of the recycle utilization large span factory building of steel structure

Contact Supplier

Ms. BRD Mia General Manager Chat Now
Telephone
86-374-7028577
Mobile
0086 18237476209
Fax
86-374-7027177
Address
Changge Weiwu Road Xuchang,Henan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Structures
Categories
Hi~